Pages
- Bidding Documents_compressed
- Bidding Documents_compressed
- Invitation to Bid
- Notice for Negotiated Procurement
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- A Welcome Message from the College Dean
- AACCUP Trained Accreditors
- ABOUT
- Abstract of Bids as NOA
- Abstract of Bids_
- Abstract of Bids_as NOA_
- Abstract of BIDS_as NOA_1
- Abstract of Canvass as NOA_0
- Abstract of Canvass as NOA_01
- Abstract of Canvass as NOA_10
- Abstract of Canvass as NOA_4
- Abstract of Canvass as NOA_5
- Abstract of Canvass as NOA_6
- Abstract of Canvass_
- Abstract of Canvass_0
- Abstract of Canvass_1
- Abstract of Canvass_2
- Abstract of Canvass_3
- Abstract of Canvass_4
- Abstract of Canvass_5
- Abstract of Canvass_6
- Abstract of Canvass_as NOA
- Abstract of Canvass_as NOA_
- Abstract of Canvass_as NOA_8
- Abstract of Canvass_NOA
- Abstract of Canvass_NOA
- Abstract of Canvass_NOA P.2
- Abstract of Canvass_NTP
- Abstract of Quotation_
- Abstract of Seale Quotations
- Abstract of Sealed Quotation_
- Abstract of Sealed Quotation_0
- Abstract of Sealed Quotation_1
- Abstract of Sealed Quotation_2
- Abstract of Sealed Quotation_3
- Abstract of Sealed Quotation_NTP
- ACADEMICS
- Acquisition of ISO Standard Furniture and Fixtures for Administration, Accounting and Registrar’s Offices
- Additional Materials for Construction of KSU Rizal Goat Farm
- Additional Office Supplies and Materials for ICU
- Adjacent Contract for Additional Renovation of Administration Building Offices
- Administrative Order Designating the FY 2019 PBB Team
- Administrative Order Designating the SPMS-PMT
- Admission
- Advertisement of RFQ_
- Advertisement of RFQ_0
- Advertisement of RFQ_1
- AFS FYM 2018
- AFS FYM 2019
- AFS FYM 2020
- AFS FYM 2021
- AFS FYM 2022
- Agency Information Inventory, 2023 FOI Summary Report, and 2023 FOI Registry
- Agency Performance Review Report 2018
- Agency Performance Review Report 2019
- Agency Performance Review Report 2020
- Agency Performance Review Report 2021
- Agency Performance Review Report 2022
- Agency Performance Review Report 2023
- Agency Review and Compliance Procedure of Statements and Financial Disclosures
- Agricultural and Office Materials, and Fixtures for Tesda-Animal Production
- Agricultural Materials, Office Equipment, and Fixtures for Tesda-Agricultural Crop Production
- Agricultural Supplies for KSU TESDA Training and Assessment Center
- Annex 1: Schedule of Prices for Lot_1
- Annex A TOR for Certifying Body
- Annex A_Bill of Quantities
- Annex A_Bill of Quantities
- Annex A_Bill of Quantities
- Annex A_Bill of Quantities
- Annex A_Bill of Quantities_40
- Annex A_Bill of Quantities_41
- Annex A_Bill of Quantities_42
- Annex A_Bill of Quantities_43
- Annex A_Bill of Quantities_44
- Annex A_Bill of Quantities_45
- Annex A_Schedule of Prices
- Annex A_Schedule of Prices
- Annex A_Schedule of Prices_0
- Annex A_Schedule of Prices_32
- Annex A_Schedule of Prices_33
- Annex A_Schedule of Prices_34
- Annex A_TOR ECC
- Annex A_TOR-ECC
- Annex A: Bid Documents_
- Annex A: Bill of Quantities
- Annex A: Bill of Quantities_
- Annex A: Bill of Quantities_0
- Annex A: Bill of Quantities_1
- Annex A: Bill of Quantities_10
- Annex A: Bill of Quantities_11
- Annex A: Bill of Quantities_12
- Annex A: Bill of Quantities_13
- Annex A: Bill of Quantities_14
- Annex A: Bill of Quantities_15
- Annex A: Bill of Quantities_16
- Annex A: Bill of Quantities_17
- Annex A: Bill of Quantities_18
- Annex A: Bill of Quantities_19
- Annex A: Bill of Quantities_2
- Annex A: Bill of Quantities_20
- Annex A: Bill of Quantities_21
- Annex A: Bill of Quantities_22
- Annex A: Bill of Quantities_23
- Annex A: Bill of Quantities_24
- Annex A: Bill of Quantities_25
- Annex A: Bill of Quantities_26
- Annex A: Bill of Quantities_27
- Annex A: Bill of Quantities_28
- Annex A: Bill of Quantities_29
- Annex A: Bill of Quantities_3
- Annex A: Bill of Quantities_3
- Annex A: Bill of Quantities_30
- Annex A: Bill of Quantities_31
- Annex A: Bill of Quantities_32
- Annex A: Bill of Quantities_33
- Annex A: Bill of Quantities_34
- Annex A: Bill of Quantities_35
- Annex A: Bill of Quantities_37
- Annex A: Bill of Quantities_38
- Annex A: Bill of Quantities_4
- Annex A: Bill of Quantities_4
- Annex A: Bill of Quantities_5
- Annex A: Bill of Quantities_50
- Annex A: Bill of Quantities_6
- Annex A: Bill of Quantities_7
- Annex A: Bill of Quantities_8
- Annex A: Bill of Quantities_9
- Annex A: BOQ_
- Annex A: BOQ_0
- Annex A: BOQ_1
- Annex A: BOQ_2
- Annex A: Checklist for Eligibility
- Annex A: Checklist for Eligibility
- Annex A: Checklist for Eligibility & Tech Components
- Annex A: Checklist for Eligibility_
- Annex A: Checklist for Eligibility_
- Annex A: Checklist for Eligibility_
- Annex A: Checklist for Eligibility_
- Annex A: Checklist for Eligibility_
- Annex A: Checklist for Eligibility_0
- Annex A: Checklist for Eligibility_10
- Annex A: Checklist for Eligibility_11
- Annex A: Checklist for Eligibility_4
- Annex A: Checklist for Eligibility_5
- Annex A: Checklist for Eligibility_6
- Annex A: Checklist for Eligibility_8
- Annex A: Checklist for Eligibility_9
- Annex A: Checklist for Eligibility_Tech
- Annex A: Checklist for Eligibility_Tech & Fin_
- Annex A: Checklist for Eligibility_tech_financial_
- Annex A: Checklist for Eligibility, Tech & Components_
- Annex A: Checklist for Eligibility, Tech & Financial Comp_
- Annex A: Conformity with TechSpecs
- Annex A: Design of T-shirt
- Annex A: Financial Bid Form_
- Annex A: Financial Bid Form_0
- Annex A: Financial Bid Form_1
- Annex A: Financial Bid Form_2
- Annex A: Financial Bid Form_3
- Annex A: Financial Bid Form_4
- Annex A: Financial Bid Form_5
- Annex A: Financial Bid Form_6
- Annex A: Financial Bid Form_9
- Annex A: Financial Bid_Form
- Annex A: Instructions to Bidders_
- Annex A: Instructions to Bidders_
- Annex A: Instructions to Bidders_1
- Annex A: Instructions to Suppliers
- Annex A: Integrity for Pledge for KSU_
- Annex A: Integrity Pledge for KSU
- Annex A: Integrity Pledge for KSU
- Annex A: Integrity Pledge for KSU Provider_
- Annex A: Integrity Pledge for KSU Service
- Annex A: Integrity Pledge for KSU_
- Annex A: Integrity Pledge for KSU_
- Annex A: Integrity Pledge_KSU
- Annex A: Layout 1_
- Annex A: Price of Quotation Form
- Annex A: Price of Quotation Form
- Annex A: Price Quotation Form_1
- Annex A: Sample of Items_
- Annex A: Sample Pictures_
- Annex A: Schedule of Prices
- Annex A: Schedule of Prices 27_1
- Annex A: Schedule of Prices for Lot 1
- Annex A: Schedule of Prices_
- Annex A: Schedule of Prices_0
- Annex A: Schedule of Prices_1
- Annex A: Schedule of Prices_1
- Annex A: Schedule of Prices_10
- Annex A: Schedule of Prices_11
- Annex A: Schedule of Prices_116
- Annex A: Schedule of Prices_119
- Annex A: Schedule of Prices_12
- Annex A: Schedule of Prices_13
- Annex A: Schedule of Prices_14
- Annex A: Schedule of Prices_15
- Annex A: Schedule of Prices_17
- Annex A: Schedule of Prices_18
- Annex A: Schedule of Prices_2
- Annex A: Schedule of Prices_20
- Annex A: Schedule of Prices_21
- Annex A: Schedule of Prices_22
- Annex A: Schedule of Prices_23
- Annex A: Schedule of Prices_24
- Annex A: Schedule of Prices_25
- Annex A: Schedule of Prices_26
- Annex A: Schedule of Prices_27
- Annex A: Schedule of Prices_28
- Annex A: Schedule of Prices_29
- Annex A: Schedule of Prices_3
- Annex A: Schedule of Prices_30
- Annex A: Schedule of Prices_31
- Annex A: Schedule of Prices_36
- Annex A: Schedule of Prices_37
- Annex A: Schedule of Prices_38
- Annex A: Schedule of Prices_39
- Annex A: Schedule of Prices_4
- Annex A: Schedule of Prices_5
- Annex A: Schedule of Prices_6
- Annex A: Schedule of Prices_8
- Annex A: Schedule of Prices_9
- Annex A: Schedule of Prices_Corrected
- Annex A: Schedule of Prices_for Lot 1
- Annex A: Schedule of Prices_for Lot 1
- Annex A: Schedule of Prices_Lot 1
- Annex A: Schedule of Prices_Lot 1
- Annex A: Scope of Work
- Annex A: Scope of Work_Lot 6
- Annex A: Scope of Works_
- Annex A: Scope of Works_
- Annex A: Scope of Works_
- Annex A: Scope of Works_
- Annex A: Scope of Works_0
- Annex A: Scope of Works_0
- Annex A: Scope of Works_1
- Annex A: Scope of Works_1
- Annex A: Scope of Works_10
- Annex A: Scope of Works_11
- Annex A: Scope of Works_12
- Annex A: Scope of Works_13
- Annex A: Scope of Works_14
- Annex A: Scope of Works_15
- Annex A: Scope of Works_16
- Annex A: Scope of Works_17
- Annex A: Scope of Works_18
- Annex A: Scope of Works_19
- Annex A: Scope of Works_2
- Annex A: Scope of Works_2
- Annex A: Scope of Works_20
- Annex A: Scope of Works_3
- Annex A: Scope of Works_4
- Annex A: Scope of Works_5
- Annex A: Scope of Works_6
- Annex A: Scope of Works_7
- Annex A: Scope of Works_8
- Annex A: Scope of Works_9
- Annex A: Scope of WorkShop_1
- Annex A: Term of Reference_
- Annex A: Terms of Reference
- Annex A: Terms of Reference_
- Annex A: TOR
- Annex A: TOR for Certifying Body_
- Annex A: TOR for Certifying Body_1_2
- Annex A. 1: Schedule of Prices
- Annex A. TOR PQA
- Annex A1: Schedule of Prices for Lot 1
- Annex B: Model_5
- Annex B: Plan No. 4_Lab Ceiling
- Annex B: Price Quotation Form
- Annex B: Terms of Reference
- Annex C: Bidding Forms_
- Annex C: Drawing Plan No.3
- Annex D: Bidding Forms 0
- Annex D: Bidding Forms_
- Annex F: Integrity Pledge for KSU
- Annex F: Integrity Pledge for KSU Service Provider_
- Annex F: Integrity Pledge for KSU Service_0
- Annex F: Sample of Bidding Forms_
- Annex F: Sanitary & Plumbing Design_
- Annex_A Bill of Quantities_39
- Annex_A Schedule of Prices
- Annual Procurement Plan for Common-use Supplies and Equipment FY 2019
- Annual Reports on the Status of Income authorized by law to be deposited outside the National Treasury
- ARTA Certificate of Compliance (as of Dec. 5, 2019)
- BAC RESO
- BAC Reso_097
- BAC Reso_293
- BAC Reso_342
- BAC Reso_53
- BAC Resolution_316
- BAC_51
- BAC_RESO_
- BAC_RESO_
- BAC_RESO_0
- BAC_RESO_0
- BAC_RESO_001
- BAC_RESO_002
- BAC_RESO_002
- BAC_RESO_002
- BAC_RESO_01_2017
- BAC_RESO_025
- BAC_RESO_029
- BAC_RESO_062
- BAC_RESO_074
- BAC_RESO_075
- BAC_RESO_076
- BAC_RESO_1
- BAC_RESO_1
- BAC_RESO_1
- BAC_RESO_10
- BAC_RESO_100
- BAC_RESO_101
- BAC_RESO_102
- BAC_RESO_103
- BAC_RESO_105
- BAC_RESO_106
- BAC_RESO_107
- BAC_RESO_108
- BAC_RESO_109
- BAC_RESO_11
- BAC_RESO_110
- BAC_RESO_112
- BAC_RESO_113
- BAC_RESO_114
- BAC_RESO_13
- BAC_RESO_148
- BAC_RESO_17
- BAC_RESO_18
- BAC_RESO_19
- BAC_RESO_19
- BAC_RESO_2
- BAC_RESO_2
- BAC_RESO_20
- BAC_RESO_21
- BAC_RESO_22
- BAC_RESO_23
- BAC_RESO_24
- BAC_RESO_25
- BAC_RESO_254
- BAC_RESO_26
- BAC_RESO_27
- BAC_RESO_270
- BAC_RESO_28
- BAC_RESO_29
- BAC_RESO_3
- BAC_RESO_30
- BAC_RESO_31
- BAC_RESO_316
- BAC_RESO_317
- BAC_RESO_32
- BAC_RESO_33
- BAC_RESO_34
- BAC_RESO_35
- BAC_RESO_36
- BAC_RESO_366
- BAC_RESO_368
- BAC_RESO_37
- BAC_RESO_38
- BAC_RESO_383
- BAC_RESO_39
- BAC_RESO_4
- BAC_RESO_40
- BAC_RESO_406
- BAC_RESO_41
- BAC_RESO_413
- BAC_RESO_413
- BAC_RESO_42
- BAC_RESO_43
- BAC_RESO_431
- BAC_RESO_44
- BAC_RESO_45
- BAC_RESO_451
- BAC_RESO_459
- BAC_RESO_46
- BAC_RESO_465
- BAC_RESO_497
- BAC_RESO_5
- BAC_RESO_50
- BAC_RESO_51
- BAC_RESO_52
- BAC_RESO_53
- BAC_RESO_532
- BAC_RESO_54
- BAC_RESO_55
- BAC_RESO_56
- BAC_RESO_57
- BAC_RESO_58
- BAC_RESO_59
- BAC_RESO_6
- BAC_RESO_60
- BAC_RESO_61
- BAC_RESO_62
- BAC_RESO_622
- BAC_RESO_63
- BAC_RESO_64
- BAC_RESO_65
- BAC_RESO_66
- BAC_RESO_67
- BAC_RESO_68
- BAC_RESO_69
- BAC_RESO_7
- BAC_RESO_70
- BAC_RESO_71
- BAC_RESO_717
- BAC_RESO_72
- BAC_RESO_728
- BAC_RESO_729
- BAC_RESO_73
- BAC_RESO_731
- BAC_RESO_732
- BAC_RESO_733
- BAC_RESO_734
- BAC_RESO_74
- BAC_RESO_744
- BAC_RESO_75
- BAC_RESO_755
- BAC_RESO_756
- BAC_RESO_76
- BAC_RESO_77
- BAC_RESO_78
- BAC_RESO_79
- BAC_RESO_8
- BAC_RESO_80
- BAC_RESO_81
- BAC_RESO_82
- BAC_RESO_83
- BAC_RESO_84
- BAC_RESO_85
- BAC_RESO_86
- BAC_RESO_869
- BAC_RESO_87
- BAC_RESO_88
- BAC_RESO_89
- BAC_RESO_9
- BAC_RESO_90
- BAC_RESO_91
- BAC_RESO_92
- BAC_RESO_93
- BAC_RESO_93
- BAC_RESO_94
- BAC_RESO_95
- BAC_RESO_96
- BAC_RESO_97
- BAC_RESO_98-1
- BAC_RESO_99
- BAC_RESO_apr17-2017
- BAC_RESO_D4_recomending Approval
- BAC_RESO_Declaring Failure
- BAC_RESO_f7
- BAC_RESO_F7
- BAC_RESO_RecomAward
- BAC_RESO_RecomAward
- BAC_RESO_Recommending Approval
- BAC_RESO_Recommending Award
- BAC_RESO_Recommending Award
- BAC_RESO_Recommending Award & Approval
- BAC_RESO_Recommending Award and Approval_
- BAC_RESO_Recommending Award_
- BAC_RESO_signed
- BAC_RESO_signed
- BAC_RESO_signed
- BAC_RESO_signed
- BAC_RESO-111
- BACC_RESO_Sep7_2016
- BAR 1 2024 Second Quarter
- BAR 1 2024 Third Quarter
- BFAR FY 2018
- BFAR FY 2019
- BFAR FY 2020
- BFAR FY 2021
- BFAR FY 2021
- BFAR FY 2022
- BFAR FY 2022
- Bid Document_0
- Bid Document_1
- Bid Documents
- Bid Documents 4Website_
- Bid Documents Class Bldg
- Bid Documents Class Bldg
- Bid Documents Final Repair & Renovation of Forestry Bldg
- Bid Documents Final Repair and renovation of Forestry
- Bid Documents for KSU Web_
- Bid Documents for NP_0
- Bid Documents Livestock
- Bid Documents perimeter Fencing
- Bid Documents revised_2016
- Bid Documents_
- Bid Documents_
- Bid Documents_
- Bid Documents_
- Bid Documents_0-2
- Bid Documents_03
- Bid Documents_1
- Bid Documents_10
- Bid Documents_103
- Bid Documents_11
- Bid Documents_12
- Bid Documents_12
- Bid Documents_13
- Bid Documents_13
- Bid Documents_14
- Bid Documents_15
- Bid Documents_16
- Bid Documents_16
- Bid Documents_17
- Bid Documents_17
- Bid Documents_18
- Bid Documents_18
- Bid Documents_19
- Bid Documents_19
- Bid Documents_2
- Bid Documents_2
- Bid Documents_2
- Bid Documents_20
- Bid Documents_20
- Bid Documents_21
- Bid Documents_21
- Bid Documents_22
- Bid Documents_22
- Bid Documents_23
- Bid Documents_23
- Bid Documents_24
- Bid Documents_25
- Bid Documents_26
- Bid Documents_26
- Bid Documents_27
- Bid Documents_27
- Bid Documents_28
- Bid Documents_29
- Bid Documents_29
- Bid Documents_3
- Bid Documents_30
- Bid Documents_30
- Bid Documents_31
- Bid Documents_31
- Bid Documents_32
- Bid Documents_32
- Bid Documents_33
- Bid Documents_33
- Bid Documents_34
- Bid Documents_34
- Bid Documents_35
- Bid Documents_36
- Bid Documents_37
- Bid Documents_38
- Bid Documents_39
- Bid Documents_4
- Bid Documents_4
- Bid Documents_40
- Bid Documents_41
- Bid Documents_42
- Bid Documents_43
- Bid Documents_44
- Bid Documents_45
- Bid Documents_46
- Bid Documents_47
- Bid Documents_5
- Bid Documents_50
- Bid Documents_52
- Bid Documents_52
- Bid Documents_53
- Bid Documents_54
- Bid Documents_55
- Bid Documents_56
- Bid Documents_57
- Bid Documents_58
- Bid Documents_59
- Bid Documents_6
- Bid Documents_60
- Bid Documents_61
- Bid Documents_62
- Bid Documents_63
- Bid Documents_64
- Bid Documents_65
- Bid Documents_66
- Bid Documents_67
- Bid Documents_68
- Bid Documents_69
- Bid Documents_7
- Bid Documents_70
- Bid Documents_71
- Bid Documents_72
- Bid Documents_73
- Bid Documents_74
- Bid Documents_75
- Bid Documents_76
- Bid Documents_77
- Bid Documents_78
- Bid Documents_79
- Bid Documents_8
- Bid Documents_80
- Bid Documents_81
- Bid Documents_82
- Bid Documents_83
- Bid Documents_84
- Bid Documents_85
- Bid Documents_87
- Bid Documents_89
- Bid Documents_9
- Bid Documents_90
- Bid Documents_91
- Bid Documents_92
- Bid Documents_93
- Bid Documents_94
- Bid Documents_95
- Bid Documents_96
- Bid Documents_97
- Bid Documents_98
- Bid Documents_Consolidated Purchase of Computer Desktop for 3 OfficesBid Documents_
- Bid Documents_Design & Build
- Bid Documents_Final
- Bid Documents_for NP
- Bid Documents_G2
- Bid Documents_Purchase and Delivery
- Bid Documents_revised
- Bid Documents_revised
- Bid Documents_revised
- Bid Documents_revised 2016
- Bid Documents_revised 2016
- Bid Documents_revised_2016
- Bid Documents_Smart Campus
- Bid Documents_Smart Campus
- Bid Notice Abstract_
- Bid Supplement_
- Bid Supplement_01
- Bid Supplement_01
- Bid Supplement_01-2
- Bid Supplement_01-3
- Bid Supplement_4
- Bidding Document_57
- Bidding Documents
- Bidding Documents
- Bidding Documents Compressed_1
- Bidding Documents Disposal 2023
- Bidding Documents_
- Bidding Documents_
- Bidding Documents_0
- Bidding Documents_10
- Bidding Documents_100
- Bidding Documents_101
- Bidding Documents_11
- Bidding Documents_14
- Bidding Documents_25
- Bidding Documents_2nd Bidding
- Bidding Documents_3
- Bidding Documents_35
- Bidding Documents_36
- Bidding Documents_37
- Bidding Documents_38
- Bidding Documents_40
- Bidding Documents_42
- Bidding Documents_43
- Bidding Documents_44
- Bidding Documents_45
- Bidding Documents_46
- Bidding Documents_47
- Bidding Documents_48
- Bidding Documents_49
- Bidding Documents_5
- Bidding Documents_50
- Bidding Documents_51
- Bidding Documents_52
- Bidding Documents_53
- Bidding Documents_54
- Bidding Documents_55
- Bidding Documents_56
- Bidding Documents_6
- Bidding Documents_60
- Bidding Documents_7
- Bidding Documents_8
- Bidding Documents_9
- Bidding Documents_99
- Bidding Documents_Compressed
- Bidding Documents.1
- Bidding Forms_0
- Bidding Forms_7
- Bids and Award Posting
- Bids and Awards Committee
- Bill of Quantities_
- Board of Regents
- CA_41
- CA_58
- Calendar
- Careers@KSU
- Catering of Meals and Snacks and Hall Rental for Values Re-Orientation, CSC Updates and Re-Echo of Seminars and Trainings Attended
- Catering of Meals and Snacks for Native Pig 1st Fookah Fiesta
- Catering of Snacks and Meals for Online Training on Tertiary Level Learning Packet
- Catering Services and Hall Rental for DRRM, Extension and Gender Sensitivity Training
- Catering Services for Meals and Snacks on KSU Level IV Accreditation
- Catering Services for Meals and Snacks on Public Procurement Specialist Training Course
- Catering Services for Snacks and Meals during the Continuing Extension Program of CoEd in Empowering its Adopted Schools
- Catering Services of Meals and Snacks for CHED Collaborative Online Training on Flexible Leaning
- Catering Services of Snacks and Meals for KSU 2020 Accreditation
- Certificate of Compliance (as of June 1, 2017)
- Certificate of Compliance after Validation (as of August 1, 2018)
- Certificate of Compliance Certificate
- Certification of Compliance
- Certification on Approval of KSU’s SPMS by the CSC
- Certified Copy of the KSU’s ISO Certificate of Registration
- Certified Copy of the KSU’s ISO Certificate of Registration
- Checklist of Requirements and Omnibus Sworn Statement on CAV
- Checklist of Requirements and Omnibus Sworn Statement on CAV
- Checklist of Requirements and OSS
- Checklist of Requirements and OSS
- Chicken Layer Mash 2 for Egg Production Feed Supplies for January and February 2018
- Citizen’s Charter Handbook (2019 1st Edition)
- Citizens Charter
- Citizens Charter Manual (previous edition)
- Client Feedback Form
- Client Satisfaction Measurement
- COA Audit Findings and Recommendations FY 2018
- COA Audit Findings and Recommendations FY 2019
- COA Audit Findings and Recommendations FY 2020
- COA Audit Findings and Recommendations FY 2021
- COA Audit Findings and Recommendations FY 2022
- College of Criminal Justice Education Quality Manual
- Colleges
- Completion of 4 Storey Academic Building Phase III – Bulanao Campus
- Completion of 4 Storey Academic Building Phase III – Bulanao Campus
- Completion of 4-Storey Academic Building- Phase III Savings
- Completion of Alumni Center
- Completion of Alumni Center (2nd Bidding)
- Completion of Graduate Studies and Law Building
- Completion of Graduate Studies and Law Building
- Completion of Graduate Studies and Law Building – Phase III
- Completion of HRM Extension Building
- Completion of HRM Extension Building (2nd Bidding)
- Completion of KSU Mushroom Building
- Completion of Library Building – Rizal Campus
- Completion of Library Building – Rizal Campus
- Completion of Motorpool- Bulanao Campus
- Completion of Motorpool- Bulanao Campus
- Completion of Performing Arts Theater
- Completion of Performing Arts Theater
- Completion of Performing Arts Theater- Savings
- Completion of Science and Technology Processing Center
- Completion of Technology and Innovation Park B – Bulanao Campus
- Completion of Technology and Innovation Park-Bulanao Campus
- Completion of the Rehabilitation of Old Tech-Voc Building
- Completion of the Rehabilitation of Old Tech-Voc Building
- Concreting of Road Network
- Concreting of Road Network Phase XIII
- Concreting of Road Network- Phase XI
- CONCRETING OF ROAD OF BULANAO CAMPUS
- Construction and/or Rehabilitation of Multi-Purpose Building including Php500,000.00 for Sports’ Facilities
- Construction and/or Rehabilitation of Multi-Purpose Building including Php500,000.00 for Sports’ Facilities
- Construction and/or Rehabilitation of Multi-Purpose Building including Php500,000.00 for Sports’ Facilities-Phase 11a
- Construction and/or Rehabilitation of Multi-Purpose Building including Php500,000.00 for Sports’ Facilities-Phase 1a
- Construction and/or Rehabilitation of Multi-Purpose including Php500,000 for Sports Facilities- Final Phase (2nd Bidding)
- Construction of 4-Storey Academic Building in Bulanao (Initial Phase)
- Construction of Balatoc Multi-Purpose Building
- CONSTRUCTION OF BAMBOO NURSERY IN RIZAL CAMPUS
- Construction of Bamboo Nursery in Rizal Campus-Second Bidding
- Construction of Bantayog ng Wika Sculpture, Base and Pedestal
- Construction of Colayo Daycare Center Building
- Construction of Covered Multi-Purpose Hall of CBAA Building of Dagupan Campus- Phase II
- Construction of Covered Pathway at KSU Rizal Campus
- CONSTRUCTION OF COVERED THIRD FLOOR OF CLASS BUILDING DAGUPAN CAMPUS – REDESIGNED
- Construction of Covered Third Floor of CLASS Building-Dagupan Campus
- Construction of Covered Third Floor of CLASS Building-Dagupan Campus
- CONSTRUCTION OF FOOD AND TECHNOLOGY INNOVATION CENTER AT RIZAL CAMPUS
- Construction of Food and Technology Innovation Center at Rizal Campus-Second Bidding
- Construction of Four Storey Academic Building- Phase II-Bulanao Campus
- Construction of Four Storey Academic Building- Phase II-Bulanao Campus
- Construction of Four Storey Academic Building- Phase II-Bulanao Campus
- Construction of Four-Storey Library Building at Bulanao Campus- Phase I
- Construction of Four-Storey Library Building at Bulanao Campus- Phase I
- CONSTRUCTION OF GENERATOR SET HOUSE FOR BUTTON MUSHROOM BUILDING
- Construction of Greenhouse- Phase I & II
- Construction of Gymnasium Phase IV (Second Bidding)
- Construction of HRM Building- Phase V
- Construction of HRM Building- Phase V
- Construction of HRM Building- Phase V
- Construction of HRM Building-Phase IV
- Construction of HRM Building-Phase IV
- Construction of Kalinga Livelihood Museum and KSU Alumni Center Phase II
- Construction of KSU Mushroom Building- Phase II
- Construction of KSU-Bulanao Campus Gate 2
- Construction of KSU-Bulanao Campus Gate 2-Phase I
- Construction of KSU-Rizal Campus Covered Court
- Construction of KSU-Rizal Campus Covered Court
- Construction of KSU-Rizal Campus Goat Farm
- Construction of KSU-Rizal Campus Goat Farm
- Construction of Ladies Dormitory- Rizal Campus
- Construction of Livestock R & D- Native Animals Nucleus Herd Center (Native Pig, Poultry Layer and Broiler)
- Construction of Livestock R & D- Native Animals Nucleus Herd Center (Native Pig, Poultry Layer and Broiler)-2nd Bidding
- Construction of Materials Recovery Facility
- Construction of Motorpool
- Construction of Motorpool- Phase II
- CONSTRUCTION OF NURSERY
- Construction of Nursery for Massive Seeds and Seedling Production
- Construction of One-Storey School Building
- Construction of Performing Arts Theater in Bulanao Campus (Package Contract)
- Construction of Performing Arts Theater in Bulanao Campus (Package Contract) (2nd Bidding)
- Construction of Perimeter Fencing – Bulanao Campus
- Construction of Perimeter Fencing – Rizal Campus
- Construction of Perimeter Fencing – Rizal Campus
- Construction of Perimeter Fencing at Bulanao Campus – Phase II
- Construction of Perimeter Fencing at Bulanao Campus – Phase III
- Construction of Perimeter Fencing at Bulanao Campus-Phase IV
- Construction of Perimeter Fencing at Rizal Campus- Mulberry Farm
- Construction of Power House and Supply and Installation of Generator Set
- Construction of Research and Extension Center
- Construction of Research and Extension Center
- Construction of Research, Agriculture and Forestry Laboratory Building and Upgrading of Facilities and Fixtures
- Construction of Science and Technology Processing Center
- Construction of Technology and Innovation Park- Bulanao Campus
- CONSTRUCTION OF TECHNOLOGY AND INNOVATION PARK- BULANAO CAMPUS SAVINGS
- CONSTRUCTION OF TECHNOLOGY AND INNOVATION PARK: SAVINGS-GENERATOR SET AND PUMP HOUSE
- CONSTRUCTION OF WATERLINE SYSTEM AT BULANAO CAMPUS
- Construction/Rehabilitation of Cesspool Tanks
- Construction/Repair/Rehabilitation of Academic Building
- Construction/Repair/Rehabilitation of Academic Buildings (First Bidding)
- Construction/Repair/Rehabilitation of Academic Buildings (Second Bidding)
- Consultancy Services for Drafting of Various Maps for KSU Campuses
- Consulting Services on Architectural Design Review, Structural Design Review, Plumbing and Sanitary Designs, Electrical Design, Fire Detection and Alarm System, Mechanical Design of Elevator and Cost Estimates for Construction of Four Storey Academic Buil
- Contact Details
- Contact Us
- Contract Agreement
- Contract Agreement_
- Contract Agreement_
- Contract Agreement_
- Contract Agreement_0
- Contract Agreement_002
- Contract Agreement_1
- Contract Agreement_1
- Contract Agreement_10
- Contract Agreement_11
- Contract Agreement_12
- Contract Agreement_13
- Contract Agreement_14
- Contract Agreement_15
- Contract Agreement_16
- Contract Agreement_17
- Contract Agreement_18
- Contract Agreement_19
- Contract Agreement_2
- Contract Agreement_20
- Contract Agreement_21
- Contract Agreement_22
- Contract Agreement_23
- Contract Agreement_24
- Contract Agreement_24
- Contract Agreement_24
- Contract Agreement_25
- Contract Agreement_26
- Contract Agreement_27
- Contract Agreement_28
- Contract Agreement_29
- Contract Agreement_3
- Contract Agreement_30
- Contract Agreement_4
- Contract Agreement_5
- Contract Agreement_6
- Contract Agreement_7
- Contract Agreement_8
- Contract Agreement_9
- Contract Agreement_D6
- Contract Agreement_Dec23_2016
- Contract Agreement_f9
- Contract Agreement_F9
- Contract Agreement_F9
- Contract Agreement_signed
- Contract Agreement_X
- Contract Duly signed_F9
- Contract Information
- Contract of Agreement_0
- Contract of Agreement_signed
- Contract thru combined POs
- Contract thru Purchase Order_
- Conversion of FITS Center into Medical and Dental Clinic
- Conversion of FITS Center into Medical and Dental Clinic Savings
- Conversion of Technology Building to Guidance Center and Scholarship Office
- Creation of Quality Management System (QMS) Committee
- Curricular Programs
- Curricular Programs
- Customized Plaques for Service Awardees on KSU Foundation Anniversary
- DBM Approved Budget and Corresponding Targets 2018
- DBM Approved Budget and Corresponding Targets 2019
- DBM Approved Budget and Corresponding Targets 2020
- DBM Approved Budget and Corresponding Targets 2021
- DBM Approved Budget and Corresponding Targets 2022
- DBM Approved Budget and Corresponding Targets 2023
- DBM Approved Budget and Corresponding Targets 2024
- Delivery and Installation of Protective Covering for Basketball Court
- Design and Construction of two units Potable Water Systems at Bulanao Campus
- Designated list of FOI Receiving Officer
- Designated list of FOI Receiving Officer and its contact details
- DISPOSAL BY AUCTION OF VARIOUS UNSERVICEABLE MOTOR VEHICLES OF THE KALINGA STATE UNIVERSITY
- Downloads
- Downloads
- Drawing No. 4
- DSWD_Notice of Job Vacancy_01
- Electrical Repairs for Additional Loads at Central Laboratory Building
- ELECTRICAL REWIRING OF HIGH SCHOOL BUILDING
- Electricity Primary Metering for KSU-Bulanao Campus
- ELECTRIFICATION OF KSU MUSHROOM BUILDINGS
- ELECTRIFICATION OF KSU RIZAL GOAT FARM
- Electronic Freedom of Information (eFOI) Portal Onboarding Form
- Engineering Building Repair
- Establishment of a Campus-Based Kalinga Cultural Heritage and Edu-Tourism Center
- Events
- Fabrication and Installation of KSU Building Signages
- Fabrication and Printing of KSU Signages for Accreditation
- FABRICATION OF WATER TANK FOR THE SOLAR POWERED IRRIGATION SYSTEM FOR IMPROVED MULBERRY BIOMASS PRODUCTION
- Faculty and Staff
- Faculty and Staff
- Faculty and Staff
- Faculty and Staff
- Faculty and Staff
- Faculty and Staff
- Faculty and Staff
- Faculty and Staff
- Faculty And Staff
- Faculty and Staff
- Faculty and Staff
- Faculty and Staff
- Faculty Profile
- Faculty Profile
- Failed Bidding_thru BAC_RESO_496:2016
- FAR 1 2015 First Quarter
- FAR 1 2015 Fourth Quarter
- FAR 1 2015 Second Quarter
- FAR 1 2015 Third Quarter
- FAR 1 2016 First Quarter
- FAR 1 2016 Fourth Quarter
- FAR 1 2016 Second Quarter
- FAR 1 2016 Third Quarter
- FAR 1 2017 First Quarter
- FAR 1 2017 Second Quarter
- FAR 1 2017 Third Quarter
- FAR 1 2018 First Quarter
- FAR 1 2018 Fourth Quarter
- FAR 1 2018 Second Quarter
- FAR 1 2018 Third Quarter
- FAR 1 2019 First Quarter
- FAR 1 2019 Fourth Quarter
- FAR 1 2019 Second Quarter
- FAR 1 2019 Third Quarter
- FAR 1 2020 First Quarter
- FAR 1 2020 Fourth Quarter
- FAR 1 2020 Second Quarter
- FAR 1 2020 Third Quarter
- FAR 1 2021 First Quarter
- FAR 1 2021 Fourth Quarter
- FAR 1 2021 Second Quarter
- FAR 1 2021 Third Quarter
- FAR 1 2022 First Quarter
- FAR 1 2022 Fourth Quarter
- FAR 1 2022 Second Quarter
- FAR 1 2022 Third Quarter
- FAR 1 2023 – First Quarter
- FAR 1 2023 – Second Quarter
- FAR 1 2023 Fourth Quarter
- FAR 1 2023 Third Quarter
- FAR 1 2024 First Quarter
- FAR 1 2024 Second Quarter
- FAR 1 2024 Third Quarter
- FAR 1-A 2018 First Quarter
- FAR 1-A 2018 Fourth Quarter
- FAR 1-A 2018 Second Quarter
- FAR 1-A 2018 Third Quarter
- FAR 1-A 2019 First Quarter
- FAR 1-A 2019 Fourth Quarter
- FAR 1-A 2019 Second Quarter
- FAR 1-A 2019 Third Quarter
- FAR 1-A 2020 First Quarter
- FAR 1-A 2020 Fourth Quarter
- FAR 1-A 2020 Second Quarter
- FAR 1-A 2020 Second Quarter
- FAR 1-A 2021 First Quarter
- FAR 1-A 2021 Fourth Quarter
- FAR 1-A 2021 Second Quarter
- FAR 1-A 2021 Third Quarter
- FAR 1-A 2022 First Quarter
- FAR 1-A 2022 Fourth Quarter
- FAR 1-A 2022 Second Quarter
- FAR 1-A 2022 Third Quarter
- FAR 1-A 2023 First Quarter
- FAR 1-A 2023 Fourth Quarter
- FAR 1-A 2023 Second Quarter
- FAR 1-A 2023 Third Quarter
- FAR 1-A 2024 First Quarter
- FAR 1A 2024 Second Quarter
- FAR 1A 2024 Third Quarter
- FAR 2 2018 First Quarter
- FAR 2 2018 Fourth Quarter
- FAR 2 2018 Second Quarter
- FAR 2 2018 Third Quarter
- FAR 2 2019 First Quarter
- FAR 2 2019 Fourth Quarter
- FAR 2 2019 Second Quarter
- FAR 2 2019 Third Quarter
- FAR 2 2020 First Quarter
- FAR 2 2020 Fourth Quarter
- FAR 2 2020 Second Quarter
- FAR 2 2020 Third Quarter
- FAR 2 2021 First Quarter
- FAR 2 2021 Fourth Quarter
- FAR 2 2021 Second Quarter
- FAR 2 2021 Third Quarter
- FAR 2 2022 First Quarter
- FAR 2 2022 Fourth Quarter
- FAR 2 2022 Second Quarter
- FAR 2 2022 Third Quarter
- FAR 2 2023 First Quarter
- FAR 2 2023 Fourth Quarter
- FAR 2 2023 Second Quarter
- FAR 2 2023 Third Quarter
- FAR 2 2024 First Quarter
- FAR 2 2024 Second Quarter
- FAR 2 2024 Second Quarter
- FAR 2 2024 Third Quarter
- FAR 5 2024 Second Quarter
- FAR 5 2024 Third Quarter
- FAR 6 2019 Fourth Quarter
- FAR 6 2019 Second Quarter
- FAR 6 2019 Third Quarter
- FAR 6 2020 First Quarter
- FAR 6 2020 Fourth Quarter
- FAR 6 2020 Second Quarter
- FAR 6 2020 Third Quarter
- FAR 6 2021 First Quarter
- FAR 6 2021 Fourth Quarter
- FAR 6 2021 Second Quarter
- FAR 6 2021 Third Quarter
- FAR 6 2022 First Quarter
- FAR 6 2022 Fourth Quarter
- FAR 6 2022 Second Quarter
- FAR 6 2022 Third Quarter
- FAR 6 2023 First Quarter
- FAR 6 2023 Fourth Quarter
- FAR 6 2023 Second Quarter
- FAR 6 2023 Third Quarter
- FAR 6 2024 First Quarter
- FAR 6 2024 Second Quarter
- FAR 6 2024 Third Quarter
- Fencing and Labor for Construction of 2 Units Potable Water System
- Financial Plan 2018
- Financial Plan 2019
- Financial Plan 2020
- Financial Plan 2021
- Financial Plan 2022
- Financial Plan 2023
- Financial Plan 2024
- Financial Plan CY 2015
- Financial Plan CY 2016
- First Quarter (94th) Regular Board Meeting of the Kalinga State University Board of Regents
- Floor Topping and Painting of Bleachers at North and South Sides of Gymnasium
- FOI Certificate of Compliance
- FOI Feedback Report
- FOI Manual 2023
- for Purchase and Delivery of IGF Supplies and Materials Not Available at DBM-PS for CY 2023
- Freedom of Information Manual
- Furniture and Fixtures for High School Lab Faculty Room
- FY 2017 Financial Plan
- FY 2019 APP-non CSE
- FY 2019 APP-non CSE
- FY 2020 APP for Common-Supplies and Equipment
- FY 2020 APP-non CSE
- FY 2020 Indicative APP-non CSE
- FY 2020 Updated APP No. 02
- FY 2021 APP for Common-Supplies and Equipment (APP CSE)
- FY 2021 APP-non CSE
- FY 2022 APP for Common-Supplies and Equipment
- FY 2022 APP Updated
- FY 2022 APP-non CSE
- FY 2022 Indicative APP-non CSE
- FY 2023 APP for Common-Supplies and Equipment (APP CSE)
- FY 2023 APP Updated
- FY 2023 APP Updated No.02
- FY 2023 APP-non CSE
- FY 2023 Indicative APP-non CSE
- FY 2024 APP
- FY 2025 Indicative APP Non-CSE
- FY APP Indicative 2024
- Gender and Development
- Good Governance
- Government Procurement Reform Act – Works!
- Green Public Procurement
- Guide to Filling Out the Personal Data Sheet
- Guidelines on the Grant of the Performance-Based Bonus for FY 2023 (IATF-MC No. 2023-1 dated August 22, 2023
- Guidelines on the Grant of the Performance-Based Bonus for FY 2023 (IATF-MC No. 2023-1 dated August 22, 2023
- Hall Rental and Catering Services for Leadership Seminar Workshop
- Happy Birthday Dr. Marita Rana Canapi, CHED Commissioner and Chairperson, KSU Board of Regents.
- Hardware of Materials for Painting of Bulanao Campus Surroundings
- Hardware of Materials for Painting of Bulanao Campus Surroundings
- Hotel Accommodation, Hall Rental and Catering Services for Accreditators on Level 4 Programs
- Hotel and Lodging and Meeting Facilities for Seminar on Evaluating and Rating Employees Performance
- Hotel Lodging, Catering Services and Rental of Facilities for Training on Capability Building of Researchers and Extensionists
- https://www.beta.ksu.edu.ph/annex-a-schedule-of-prices_37/
- IATF Memorandum Circular No. 2020-1
- Improvement of Athletic Oval
- IMPROVEMENT OF GOATERY AND A.I. LABORATORY – KSU RIZAL CAMPUS
- IMPROVEMENT OF KSU FIRING RANGE
- Improvement of KSU Mushroom Building
- Improvement of Mushroom Building
- IMPROVEMENT OF POULTRY HOUSING – KSU BULANAO CAMPUS
- Indicative FY 2021 APP-non CSE
- Infrastructure and Smart Campus Development, Operationalization of Face-to-Face Classes and Upgrading/Procurement of Equipment – Delivery and Installation of Turnstile / RFID Software and Led Wall with Sound Systems Peripherals
- INFRASTRUCTURE AND SMART CAMPUS DEVELOPMENT, OPERATIONALIZATION OF FACE-TO-FACE CLASSES AND UPGRADING/PROCUREMENT OF EQUIPMENT – INFRASTRUCTURE / MAIN GATE CONSTRUCTION
- Installation of Electrical Floor Outlets for e-Library
- Installation of Electrical Floor Outlets for e-Library
- Installation of Roofing at Central Laboratory at KSU-Bulanao Campus
- Installation of Steel Grills and Doors at Multi-purpose Hall and R&D Center
- Internal Accreditors
- International Accreditation Forum (IAF)_United Registrar of Systems (URS)
- Internet Subscription for KSU Dagupan Campus
- Inventory of Degree Programs
- INVITATION TO BID
- INVITATION TO BID
- Invitation to Bid
- Invitation to Bid
- Invitation to BID and Status
- Invitation to Bid and Status {Tabular}
- INVITATION TO BID FOR PROCUREMENT OF OFFICE EQUIPMENT, FURNITURE AND FIXTURES INCLUDING CULTURAL MATERIALS FOR THE KALINGA CULTURAL HERITAGE STUDIES & EDU-TOURISM CENTER
- Invitation to Bid purchase of various books_1
- Invitation to Bid_
- Invitation to Bid_0
- Invitation to Bid_1
- Invitation to Bid_10
- Invitation to Bid_100
- Invitation to Bid_101
- Invitation to Bid_102
- Invitation to Bid_103
- Invitation to Bid_104
- Invitation to Bid_106
- Invitation to Bid_107
- Invitation to Bid_108
- Invitation to Bid_109
- Invitation to Bid_11
- Invitation to Bid_110
- Invitation to Bid_111
- Invitation to Bid_112
- Invitation to Bid_113
- Invitation to Bid_114
- Invitation to Bid_115
- Invitation to Bid_116
- Invitation to Bid_117
- Invitation to Bid_118
- Invitation to Bid_119
- Invitation to Bid_12
- Invitation to Bid_120
- Invitation to Bid_121
- Invitation to Bid_122
- Invitation to Bid_123
- Invitation to Bid_124
- Invitation to Bid_125
- Invitation to Bid_126
- Invitation to Bid_127
- Invitation to Bid_129
- Invitation to Bid_13
- Invitation to Bid_130
- Invitation to Bid_131
- Invitation to Bid_132
- Invitation to Bid_132
- Invitation to Bid_133
- Invitation to Bid_134
- Invitation to Bid_135
- Invitation to Bid_136
- Invitation to Bid_137
- Invitation to Bid_138
- Invitation to Bid_139
- Invitation to Bid_14
- Invitation to Bid_142
- Invitation to Bid_143
- Invitation to Bid_144
- Invitation to Bid_145
- Invitation to Bid_146
- Invitation to Bid_147
- Invitation to Bid_148
- Invitation to Bid_149
- Invitation to Bid_15
- Invitation to Bid_150
- Invitation to Bid_151
- Invitation to Bid_152
- Invitation to Bid_153
- Invitation to Bid_154
- Invitation to Bid_155
- Invitation to Bid_156
- Invitation to Bid_157
- Invitation to Bid_158
- Invitation to Bid_159
- Invitation to Bid_16
- Invitation to Bid_160
- Invitation to Bid_161
- Invitation to Bid_162
- Invitation to Bid_163
- Invitation to Bid_164
- Invitation to Bid_168
- Invitation to Bid_17
- Invitation to Bid_171
- Invitation to Bid_172
- Invitation to Bid_176
- Invitation to Bid_177
- Invitation to Bid_18
- Invitation to Bid_19
- Invitation to Bid_1TB
- Invitation to Bid_1TB
- Invitation to Bid_1TB
- Invitation to Bid_2
- Invitation to Bid_2_0
- Invitation to Bid_2_1
- Invitation to Bid_2_2
- Invitation to Bid_2_3
- Invitation to Bid_2_4
- Invitation to Bid_20
- Invitation to Bid_21
- Invitation to Bid_22
- Invitation to Bid_23
- Invitation to Bid_24
- Invitation to Bid_25
- Invitation to Bid_26
- Invitation to Bid_27
- Invitation to Bid_28
- Invitation to Bid_29
- Invitation to Bid_3
- Invitation to Bid_30
- Invitation to Bid_31
- Invitation to Bid_32
- Invitation to Bid_33
- Invitation to Bid_34
- Invitation to Bid_35
- Invitation to Bid_36
- Invitation to Bid_36Acquisition of Furniture and Fixtures for Administration, Accounting and Registrar’s OfficesInvitation to Bid_36
- Invitation to Bid_37
- Invitation to Bid_38
- Invitation to Bid_39
- Invitation to Bid_4
- Invitation to Bid_40
- Invitation to BID_41
- Invitation to Bid_42
- Invitation to Bid_43
- Invitation to Bid_44
- Invitation to Bid_45
- Invitation to Bid_46
- Invitation to Bid_47
- Invitation to Bid_48
- Invitation to Bid_49
- Invitation to Bid_5
- Invitation to Bid_50
- Invitation to Bid_51
- Invitation to Bid_52
- Invitation to Bid_53
- Invitation to Bid_54
- Invitation to Bid_55
- Invitation to Bid_56
- Invitation to Bid_57
- Invitation to Bid_58
- Invitation to Bid_59
- Invitation to Bid_60
- Invitation to Bid_61
- Invitation to Bid_62
- Invitation to Bid_65
- Invitation to Bid_66
- Invitation to Bid_68
- Invitation to Bid_68
- Invitation to Bid_69
- Invitation to Bid_7
- Invitation to Bid_70
- Invitation to Bid_71
- Invitation to Bid_72
- Invitation to Bid_73
- Invitation to Bid_74
- Invitation to Bid_75
- Invitation to Bid_76
- Invitation to Bid_77
- Invitation to Bid_78
- Invitation to Bid_79
- Invitation to Bid_8
- Invitation to Bid_80
- Invitation to Bid_81
- Invitation to Bid_82
- Invitation to Bid_83
- Invitation to Bid_84
- Invitation to Bid_85
- Invitation to Bid_86
- Invitation to Bid_87
- Invitation to Bid_88
- Invitation to Bid_89
- Invitation to Bid_9
- Invitation to Bid_90
- Invitation to Bid_91
- Invitation to Bid_92
- Invitation to Bid_93
- Invitation to Bid_94
- Invitation to Bid_95
- Invitation to Bid_96
- Invitation to Bid_97
- Invitation to Bid_98
- Invitation to Bid_99
- Invitation to Bid_Conspicuous
- Invitation to Bid_for Newspaper
- Invitation to Bid_for website & Conspicuous
- Invitation to Bid_for Website_Posting
- Invitation to Bid_revised
- Invitation to Bid_signed
- Invitation to Bid_signed_0
- Invitation to Bid_signed_1
- Invitation to Bid_signed2
- Invitation to Bid-1
- Invitation to Bid-1
- ISO Certificate 2023-2026
- ISO Certificate on Provision of services in Higher Education
- ISO Core Team
- Job Vacancy_Non-Teaching Positions_Mar 7, 2022
- Job Vacancy_Teaching Positions_Mar 8, 2022
- KSU Computer Laboratories Improvement
- KSU Computer Laboratories Improvement
- KSU CY2019 Indicative APP non-CSE
- KSU-Dagupan and Rizal Campuses Certification
- KSU-QF-HRMO-40_Confirmation of QS for IP and Omnibus Statement
- Land Re-Survey of 380 Hectares at Cawayan, Bulbul, Rizal, Kalinga
- Land Riprap at Rizal Campus
- Landscaping of the Administration Building Area
- Lease of Available Commercial Space at KSU Main Campus Multi-Purpose Building
- Lease of Venue and Catering of Foods for Planning Workshop and Presentations of Outputs
- Levelling and Gravel Filling of Gymnasium Front and Side
- Library
- List of Appointee as of December 31, 2023
- List of Appointee as of November 30, 2023
- List of Appointee as of October 2, 2023
- List of Appointee as of October 31, 2023 (Additional)
- List of Appointee for April 2023
- List of Appointees for August 2023
- List of Appointees for February 2023
- List of Appointees for January 2023
- List of Appointees for March 2023
- List of Appointees for September 2023
- List of Vacant Positions (Dec. 2017)
- List of Vacant Positions (Jan. 2019)
- List of Vacant Positions (Jul. 2018)
- List of Vacant Positions (Jul. 2019)
- List of Vacant Positions (Jul. 2019)
- List of Vacant Positions (Oct. 2018)
- List of Vacant Positions (Oct. 2018)
- MARC 1
- MARC I
- MARC I
- MARC I
- MARC I
- MARC I
- MARC I
- MARC I
- MARC I
- MARC I & MARC II
- MARC I & MARC II
- MARC II
- MARC II
- MARC II
- MARC II
- MARC II
- MARC II
- MARC II
- MARC II
- MARC II
- Meals and Accommodation of Accreditors for the Accreditation of 8 Programs for Level 4
- Meals and Services for KSU Foundation Day
- Meals and Snacks for CHNS Documentation of Ethnomedicinal Plants
- Meals and Snacks for WELCOMM Extension Seminar of CLASS
- Meals and Snacks including Lodging for Continuing Program of DRRM and NSTP
- Medicines and Supplies for Health Services
- MFO Accountability Report Card (PBB)
- Minutes of Management Review
- Modernization of Engineering Laboratory Equipment to cope-up with the global challenge
- Modifications for CNA Incentives FY 2018
- Modifications for CNA Incentives FY 2019
- Modifications for CNA Incentives FY 2020
- Modifications for CNA Incentives FY 2021
- Modifications for CNA Incentives FY 2022
- Modifications for CNA Incentives FY 2023
- Monitoring Report
- National Seminar-Workshop on Instructional Material Development
- Negotiated Procurement for Completion of Graduate Studies and Law Building
- Negotiated Procurement for Completion of Graduate Studies and Law Building
- Negotiated Procurement for Completion of Graduate Studies and Law Building
- Negotiated Procurement for Completion of Graduate Studies and Law Building
- Negotiated Procurement for Completion of Graduate Studies and Law Building
- Negotiated Procurement for Construction and/or Rehabilitation of Multi-Purpose Building including Php500,000.00 for Sports’ Facilities
- NEGOTIATED PROCUREMENT FOR CONSTRUCTION OF BAMBOO NURSERY IN RIZAL CAMPUS
- NEGOTIATED PROCUREMENT FOR CONSTRUCTION OF BAMBOO NURSERY IN RIZAL CAMPUS
- Negotiated Procurement for Construction of Four Storey Academic Building- Phase II-Bulanao Campus
- Negotiated Procurement for Construction of HRM Building-Phase IV
- Negotiated Procurement for Construction of Performing Arts Theater in Bulanao Campus (Package Contract)
- Negotiated Procurement for Construction of Performing Arts Theater in Bulanao Campus (Package Contract)
- Negotiated Procurement for Construction of Potable Water System at Bulanao Campus
- Negotiated Procurement for ICT Equipment, Peripherals and Accessories
- Negotiated Procurement for Improvement of KSU Main Gate Package Contract
- Negotiated Procurement for Purchase and Delivery of Coffee Cuttings and Polyethylene Bags under DA-CAR HVCD Program
- Negotiated Procurement for Purchase and Delivery of Equipment for Upgrading of YOOKAH Native Pig Nucleus Farm in CAR
- Negotiated Procurement for Purchase and Delivery of ICT Equipment
- Negotiated Procurement for Purchase and Delivery of Materials under DA-CAR HVCD Program
- Negotiated Procurement for Purchase and Delivery of Materials under DA-CAR HVCD Program
- Negotiated Procurement for Purchase and Delivery of Professional Books and Journals for Library Use
- Negotiated Procurement for Purchase ICT, Network and Surveillance Equipment
- Negotiated Procurement for Purchase ICT, Network and Surveillance Equipment
- Negotiated Procurement for Purchase of ICT Equipment with Peripherals, Installation, Configuration and Training
- Negotiated Procurement for Purchase of ICT Equipment with Peripherals, Installation, Configuration and Training
- Negotiated Procurement for Purchase of Laboratory and Other Equipment
- Negotiated Procurement for Purchase of Library Books
- Negotiated Procurement for Purchase of Library Books
- Negotiated Procurement for Purchase of Office and Janitorial Supplies and Materials
- Negotiated Procurement for Purchase of One Unit Coaster Vehicle
- Negotiated Procurement for Purchase of One Unit Commuter Van
- Negotiated Procurement for Purchase of One Unit Commuter Van
- Negotiated Procurement for Purchase of One Unit Passenger Van for Use at Dagupan Campus
- Negotiated Procurement for Purchase of Service Utility Vehicle
- Negotiated Procurement for Purchase of Various Books as Compliance to KSU Universitihood
- Negotiated Procurement for Purchase of Various Laboratory Equipment
- Negotiated Procurement for Purchase of Various Laboratory Equipment
- NEGOTIATED PROCUREMENT FOR REPAINTING OF ENGINEERING BUILDING AND UPGRADING OF ELEVATOR SYSTEM
- Negotiated Procurement for Upgrading of 3-Phase Line Distribution Power System of KSU Bulanao Campus- Phase I
- Negotiated Procurement for Various ICT Equipment, Peripherals and Accessories
- Negotiated Procurement for Various ICT Equipment, Peripherals and Accessories
- Negotiated Procurement of Animal Breeders, Supplies and AI Equipment for KSU Goat Multiplier Breeder Farm
- NEGOTIATED PROCUREMENT OF CY 2022 IGI-FUNDED ICT EQUIPMENT
- Negotiated Procurement of Equipment for Slope Stability Analysis and Engineering Intervention for Rice Terraces and Road Infrastructures in Terrain Areas Research Project
- Negotiated Procurement of Equipment for Slope Stability Analysis and Engineering Intervention for Rice Terraces and Road Infrastructures in Terrain Areas Research Project
- Negotiated Procurement of Field Equipment for Slope Stability Analysis and Engineering Intervention for Rice Terraces and Road Infrastructure in Terrain Areas
- Negotiated Procurement of Field Equipment for Slope Stability Analysis and Engineering Intervention for Rice Terraces and Road Infrastructure in Terrain Areas
- NEGOTIATED PROCUREMENT OF SUPPLIES, MATERIALS AND EQUIPMENT FOR CAFFEINE PROJECT
- NEGOTIATED PROCUREMENT OF SUPPLIES, MATERIALS AND EQUIPMENT FOR CAFFEINE PROJECT
- NEGOTIATED PROCUREMENT OF VARIOUS CY 2021 IGI-FUNDED LABORATORY EQUIPMENT INCLUDING FURNITURE AND FIXTURES
- Negotiated Procurement thru Emergency Cases for Construction of Four Storey Academic Building- Phase IIa
- Negotiated Procurement thru Emergency Cases for Purchase of One Unit Passenger Van for Rizal Campus
- Negtiated Procurement
- News/ Advisory
- NNP 1_0
- NNP 1_1
- NNP_063
- NNP_47
- NNP_52
- NOA
- NOA Abstract of Canvass_2
- NoA Tarilja_0001
- NOA thru Abstract of Bids_
- NOA thru Abstract of Canvass
- NOA thru Abstract of Canvass
- NOA thru Abstract of Canvass_0-1
- NOA thru Abstract of Canvass_1
- NOA thru Abstract of Canvass_1-1
- NOA thru Abstract of Canvass_10
- NOA thru Abstract of Canvass_11
- NOA thru Abstract of Canvass_12
- NOA thru Abstract of Canvass_13
- NOA thru Abstract of Canvass_14
- NOA thru Abstract of Canvass_15
- NOA thru Abstract of Canvass_16
- NOA thru Abstract of Canvass_18
- NOA thru Abstract of Canvass_19
- NOA thru Abstract of Canvass_2
- NOA thru Abstract of Canvass_20
- NOA thru Abstract of Canvass_21
- NOA thru Abstract of Canvass_22
- NOA thru Abstract of Canvass_23
- NOA thru Abstract of Canvass_24
- NOA thru Abstract of Canvass_25
- NOA thru Abstract of Canvass_6
- NOA thru Abstract of Canvass_7
- Noa thru Abstract of Canvass_8
- NOA thru Abstract of Canvass_8
- NOA Thru Abstract of Quotation_
- NOA thru Abstract of Quotation_001
- NOA thru Abstract of Quotation_1
- NOA thru Abstract of Quotation_2-1
- NOA thru abstract of Quotation_3
- NOA Thru Abstract of Quotation_4
- NOA thru Abstract of Quotation_5
- NOA thru Abstract Quotation_0
- NOA thru Abstract_
- NOA thru Combined POS
- NOA Thru PO_
- NOA_0
- NOA_1
- NOA_1
- NOA_1
- NOA_2
- NOA_20
- NOA_36
- NOA_53
- NOA_Signed
- NOA_thru Abstract of Canvass_17
- NOA_thru Abstract of Canvass_9
- NOA_Thru_Abstract fo Sealed_quotation
- NOA- Thru Abstract of Canvass_0
- Notice for Negotiated Procurement_29
- Notice for Negotiated Procurement
- Notice for Negotiated Procurement
- Notice for Negotiated Procurement
- Notice for Negotiated Procurement
- Notice for Negotiated Procurement
- Notice for Negotiated Procurement 1_3
- Notice for Negotiated Procurement_
- Notice for Negotiated Procurement_0
- Notice for Negotiated Procurement_1
- Notice for Negotiated Procurement_1
- Notice for Negotiated Procurement_1
- Notice for Negotiated Procurement_1_5
- Notice for Negotiated Procurement_10
- Notice for Negotiated Procurement_11
- Notice for Negotiated Procurement_12
- Notice for Negotiated Procurement_13
- Notice for Negotiated Procurement_14
- Notice for Negotiated Procurement_15
- Notice for Negotiated Procurement_16
- Notice for Negotiated Procurement_18
- Notice for Negotiated Procurement_19
- Notice for Negotiated Procurement_2
- Notice for Negotiated Procurement_2-0
- Notice for Negotiated Procurement_20
- Notice for Negotiated Procurement_21
- Notice for Negotiated Procurement_22
- Notice for Negotiated Procurement_23
- Notice for Negotiated Procurement_24
- Notice for Negotiated Procurement_25
- Notice for Negotiated Procurement_26
- Notice for Negotiated Procurement_27
- Notice for Negotiated Procurement_28
- Notice for Negotiated Procurement_29
- Notice for Negotiated Procurement_3
- Notice for Negotiated Procurement_30
- Notice for Negotiated Procurement_31
- Notice for Negotiated Procurement_32
- Notice for Negotiated Procurement_33
- Notice for Negotiated Procurement_34
- Notice for Negotiated Procurement_35
- Notice for Negotiated Procurement_36
- Notice for Negotiated Procurement_37
- Notice for Negotiated Procurement_38
- Notice for Negotiated Procurement_39
- Notice for Negotiated Procurement_4
- Notice for Negotiated Procurement_40
- Notice for Negotiated Procurement_41
- Notice for Negotiated Procurement_42
- Notice for Negotiated Procurement_43
- Notice for Negotiated Procurement_45
- Notice for Negotiated Procurement_46
- Notice for Negotiated Procurement_48
- Notice for Negotiated Procurement_49
- Notice for Negotiated Procurement_5
- Notice for Negotiated Procurement_50
- Notice for Negotiated Procurement_51
- Notice for Negotiated Procurement_53
- Notice for Negotiated Procurement_54
- Notice for Negotiated Procurement_55
- Notice for Negotiated Procurement_57
- Notice for Negotiated Procurement_58
- Notice for Negotiated Procurement_59
- Notice for Negotiated Procurement_6
- Notice for Negotiated Procurement_60
- Notice for Negotiated Procurement_61
- Notice for Negotiated Procurement_62
- Notice for Negotiated Procurement_63
- Notice for Negotiated Procurement_64
- Notice for Negotiated Procurement_65
- Notice for Negotiated Procurement_66
- Notice for negotiated Procurement_67
- Notice for Negotiated Procurement_7
- Notice for Negotiated Procurement_70
- Notice for Negotiated Procurement_71
- Notice for Negotiated Procurement_73
- Notice for Negotiated Procurement_74
- Notice for Negotiated Procurement_75
- Notice for Negotiated Procurement_76
- Notice for Negotiated Procurement_77
- Notice for Negotiated Procurement_78
- Notice for Negotiated Procurement_8
- Notice for Negotiated Procurement_80
- Notice for Negotiated Procurement_81
- Notice for Negotiated Procurement_85
- Notice for Negotiated Procurement_86
- Notice for Negotiated Procurement_87
- Notice for Negotiated Procurement_88
- Notice for Negotiated Procurement_9
- Notice for Negotiated Requirement_68
- Notice of Additional Vacant Positions under Contract of Service Status:
- Notice of Award
- Notice of Award
- Notice of Award & Conforme
- Notice of Award for Conforme_
- Notice of Award to Malabong_
- Notice of Award to TNJ Builders_
- Notice of Award with Conforme
- Notice of Award with Conforme_
- Notice of Award with Conforme_
- Notice of Award with Conforme_0
- Notice of Award with Conforme_0-1
- Notice of Award with Conforme_1
- Notice of Award_
- Notice of Award_
- Notice of Award_
- Notice of Award_
- Notice of Award_0
- Notice of Award_0
- Notice of Award_1
- Notice of Award_1
- Notice of Award_10
- Notice of Award_11
- Notice of Award_12
- Notice of Award_13
- Notice of Award_14
- Notice of Award_15
- Notice of Award_16
- Notice of Award_17
- Notice of Award_18
- Notice of Award_19
- Notice of Award_2
- Notice of Award_20
- Notice of Award_21
- Notice of Award_21
- Notice of Award_22
- Notice of Award_23
- Notice of Award_24
- Notice of Award_25
- Notice of Award_26
- Notice of Award_27
- Notice of Award_28
- Notice of Award_29
- Notice of Award_3
- Notice of Award_30
- Notice of Award_31
- Notice of Award_32
- Notice of Award_33
- Notice of Award_4
- Notice of Award_5
- Notice of Award_6
- Notice of Award_7
- Notice of Award_8
- Notice of Award_9
- Notice of Award_acknowledged
- Notice of Award_Aug22-2017
- Notice of Award_AVLS
- Notice of Award_BCB
- Notice of Award_Conforme
- Notice of Award_F8 with conforme
- Notice of Award_May18-2017
- Notice of Award_signed
- Notice of Award_signed
- Notice of Award_W
- Notice of Award-15
- Notice of Job Vacancy (August, 2021)
- Notice of Job Vacancy (January, 2020)
- Notice of Job Vacancy (March, 2021)
- Notice of Job Vacancy (November, 2021)
- Notice of Job Vacancy_Aug 2022
- Notice of Job Vacancy_Aug 2022
- Notice of NEDA’s Vacant Positions!
- Notice of Negotiated Procurement_56
- Notice of Postponement of Procurement Activity
- Notice of Vacant 2 Teaching Positions_September 1-11, 2023
- Notice of Vacant 2 Teaching Positions_September 1, 2023
- Notice of Vacant 3 Teaching Positions_September 1, 2023
- Notice of Vacant Position (February 2022)
- Notice of Vacant Position (March 2022)
- Notice of Vacant Position (Non-teaching) Permanent Status
- Notice of Vacant Position (Non-teaching) Permanent Status
- Notice of Vacant position (November 25, 2021)
- Notice of Vacant Position_Admin Aide III
- Notice of Vacant Position_Jun 24, 2022
- Notice of Vacant Position_Oct 19
- Notice of Vacant Positions (Permanent Status)_Jan 16, 2023
- Notice of Vacant Positions (Teaching) Permanent Status
- Notice of Vacant Positions Aug 4, 2022
- Notice of Vacant Positions July 17-27, 2023
- Notice of Vacant Positions_August 10-22, 2023
- Notice of Vacant Positions_August 14-24, 2023
- Notice of Vacant Positions_August 18-29, 2023
- Notice of Vacant Positions_August 29, 2023 to September 8, 2023
- Notice of Vacant Positions_August 31, 2023
- Notice of Vacant Positions_Jan 8-18, 2024 (Faculty)
- Notice of Vacant Positions_Jan 8-18, 2024 (Non-teaching)
- Notice of Vacant Positions_Mar 8, 2022
- Notice of Vacant Positions_May 29, 2023 to June 9, 2023
- Notice of Vacant Positions_Nov 23, 2023 to Dec 4, 2023
- Notice of Vacant Positions_Oct 19-31, 2023
- Notice of Vacant Positions_October 6-16, 2023
- Notice of Vacant Positions_September 28, 2023 to October 9, 2023
- Notice to Proceed
- Notice to Proceed with Conforme_
- Notice to Proceed with Conforme_
- Notice to Proceed_
- Notice to Proceed_
- Notice to Proceed_
- Notice to Proceed_0
- Notice to Proceed_0
- Notice to Proceed_1
- Notice to Proceed_10
- Notice to Proceed_11
- Notice to Proceed_12
- Notice to Proceed_13
- Notice to Proceed_14
- Notice to Proceed_15
- Notice to Proceed_16
- Notice to Proceed_17
- Notice to Proceed_18
- Notice to Proceed_19
- Notice to Proceed_2
- Notice to Proceed_20
- Notice to Proceed_20
- Notice to Proceed_21
- Notice to Proceed_22
- Notice to Proceed_23
- Notice to Proceed_24
- Notice to Proceed_25
- Notice to Proceed_26
- Notice to Proceed_27
- Notice to Proceed_28
- Notice to Proceed_28
- Notice to Proceed_29
- Notice to Proceed_3
- Notice to Proceed_30
- Notice to Proceed_31
- Notice to Proceed_32
- Notice to Proceed_33
- Notice to Proceed_34
- Notice to Proceed_4
- Notice to Proceed_5
- Notice to Proceed_6
- Notice to Proceed_7
- Notice to Proceed_8
- Notice to Proceed_9
- Notice to Proceed_Confirmed
- Notice to Proceed_Dec23_2016
- Notice to Proceed_F12 with Conforme
- Notice to Proceed_Z
- Now hiring. Orix Metro Leasing and Finance Corporation
- NTP for Confirmation
- NTP thru Combined POS
- NTP_
- NTP_0
- NTP_1
- NTP_1
- NTP_25
- NTP_26
- NTP_43
- NTP_61
- NTP_61
- NTP_AVLS
- NTP_Conforme
- NTP_signed
- NTP_Tarilja
- Office and Agricultural Supplies, Materials and Equipment for Heirloom Corn Research Project
- Office Materials for Guidance Services Use
- Office Memo designating the SALN Review and Compliance Committee
- Office Memo on Cascading of the Agency Review and Compliance Procedure
- Office Memo on Cascading of the System of Ranking DUs
- Office Rehabilitation near President’s Cottage
- Office Supplies and Equipment for Heirloom Corn Research Project
- Office Supplies and Materials for PCAARRD-DOST SAFE Project
- Office Supplies for Different Offices Use
- Ok Bidding Documents IGI Modernization revised after pre-procurement
- One-page FOI Manual
- Organizational Structure
- Other Supplies and Materials for DOST SAFE Project
- P.O. No.: 2023-04-0310
- Package Contract for Completion of Gymnasium- Bulanao Campus
- Package Contract for Construction of Rain Harvesting Tank
- Package Contract for Construction of Rain Harvesting Tanks
- Package Contract for Improvement of Computer Laboratories
- Package Contract for Improvement of KSU Main Gate
- Package Contract for Improvement of KSU Main Gate
- Package Contract for Improvement or Rehabilitation of Mushroom, Old Tech-Voc and Computer Laboratory Buildings
- Package Contract for Installation Services and Maintenance of Academic Buildings
- Package Contract for KSU Computer Laboratories Improvement
- Package Contract for KSU Computer Laboratories Improvement
- Package Contract for Renovation of Administration Building
- Package Contract for the Improvement or Rehabilitation of Mushroom, Old Tech-Voc and Computer Laboratory Buildings
- Package Contract for Upgrading of Yookah Native Pig Nucleus Farm in CAR
- Package Contract for Upgrading of Yookah Native Pig Nucleus Farm in CAR
- Package Lot for Repair and Maintenance of 2 Buildings at Bulanao Campus
- Painting Materials for Roof Deck Waterproofing of Central Laboratory Building
- Paper Supplies for Auxiliary Services
- PAWIM
- PBB IATF MC 2021-2
- PBB IATF MC No. 2021-1
- Philgeps Links
- PhilGEPS NTP_0
- PhilGEPS Updated
- PhilGEPS Updated_1
- PhilGEPS Updated_2
- PhilGEPS_0_1
- PhilGEPS_NOA
- PhilGEPS_NOA_0
- PhilGEPS_NOA_01
- PhilGEPS_NOA_1
- PhilGEPS_NOA_1
- PhilGEPS_NOA_2
- PhilGEPS_NOA_3
- PhilGEPS_NOA_4
- PhilGEPS_NOA_5
- PhilGEPS_NOA_7
- PhilGEPS_NOA_9
- PhilGEPS_NTP_
- PhilGEPS_NTP_1
- PhilGEPS_NTP_10
- PhilGEPS_NTP_11
- PhilGEPS_NTP_14
- PhilGEPS_NTP_15
- PhilGEPS_NTP_16
- PhilGEPS_NTP_17
- PhilGEPS_NTP_18
- PhilGEPS_NTP_19
- PhilGEPS_NTP_2
- PhilGEPS_NTP_20
- PhilGEPS_NTP_21
- PhilGEPS_NTP_22
- PhilGEPS_NTP_23
- PhilGEPS_NTP_24
- PhilGEPS_NTP_25
- PhilGEPS_NTP_3
- PhilGEPS_NTP_4
- PhilGEPS_NTP_6
- PhilGEPS_NTP_7
- PhilGEPS_NTP_8
- PhilGEPS_NTP_9
- PhilGEPS_Posted
- PhilGEPS_Updated_
- PhilGeps_Updated_3
- Philgeps_Updated_4
- Plans_
- PMR20-KalingaStateUniversity_1stSem
- PO No: 2022-09-0613
- PO No: 2022-12-1004
- PO No: 2023-01-0003
- PO No: 2023-02-0097
- President’s First Term Report (2016-2020)
- President’s Report 2016 Fourth Quarter
- President’s Report 2017 July-October
- President’s Report 2017-2020
- Printable_NOA_Pending Status_
- Printable_Notice Award
- PrintableBidNotice_Abstract_
- PrintableBidNotice_Abstract_Pending
- PrintableBidNoticeAbstract_0
- PrintableBidNoticeAbstract_Awarded
- PrintableBidNoticeAbstract_Pending_
- PRINTING AND DELIVERY OF THE PAPER PUBLICATION OF THE KSU -EARTHLINE FOR 2024
- Printing of Customized Official Receipt
- Printing of Earthline Student Publication for Second Sem of SY 2018-2019
- Printing of KSU Journal CY 2018
- Printing Services and Bookbinding of 2018 Annual Report and KSU Letter Head
- Printing Supplies for BAO Auxiliary Use
- Printing Supplies for BAO Auxiliary Use
- Printing Supplies for BAO-Auxiliary Services
- Privacy Policy
- Procurement and Installation of Air Conditioning Units for Infrastructure, Admin Conference Room, and Faculty Offices
- Procurement and Installation of Online Enrolment System with Accounting System
- Procurement Animations
- Procurement Monitoring Report
- Procurement Monitoring Report / First Semester (Jan-Jun) 2015
- Procurement Monitoring Report / First Semester (Jan-Jun) 2016
- Procurement Monitoring Report / First Semester (Jan-Jun) 2017
- Procurement Monitoring Report / First Semester (Jan-Jun) 2018
- Procurement Monitoring Report / First Semester (Jan-Jun) 2019
- Procurement Monitoring Report / First Semester (Jan-Jun) 2020
- Procurement Monitoring Report / First Semester (Jan-Jun) 2021
- Procurement Monitoring Report / First Semester (Jan-Jun) 2022
- Procurement Monitoring Report / First Semester (Jan-Jun) 2023
- Procurement Monitoring Report / Second Semester (Jul-Dec) 2015
- Procurement Monitoring Report / Second Semester (Jul-Dec) 2016
- Procurement Monitoring Report / Second Semester (Jul-Dec) 2017
- Procurement Monitoring Report / Second Semester (Jul-Dec) 2018
- Procurement Monitoring Report / Second Semester (Jul-Dec) 2019
- Procurement Monitoring Report / Second Semester (Jul-Dec) 2020
- Procurement Monitoring Report / Second Semester (Jul-Dec) 2021
- Procurement Monitoring Report / Second Semester (July – December) 2022
- Procurement Monitoring Report/ Second Semester (Jul-Dec) 2023
- Procurement Monitoring Report/ Second Semester (July-Dec) 2020
- Procurement of Agricultural Supplies and Equipment including Animal Breeders for KSU Goat Multiplier Breeder Farm
- Procurement of Agricultural Supplies and Materials for Massive Seeds and Seedling Production
- Procurement of Air Conditioning Units for Medical and Dental Clinic at Dagupan Campus
- Procurement of Animal Breeders including Supplies and AI Equipment for KSU Goat Multiplier Breeder Farm
- Procurement of Coaster Vehicle
- Procurement of Coaster Vehicle (2nd Bidding)
- PROCUREMENT OF CONSULTANCY SERVICES FOR COMMUNITY-LEVEL EVALUATION AND ASSESTMENT OF RAIN-INDUCED LANDSLIDE SUSCEPTIBILITY (CLEARS)
- PROCUREMENT OF CONSULTANCY SERVICES FOR THE ENVIRONMENTAL IMPACT STATEMENT (EIS) AND ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC) ACQUISITION OF THE KALINGA STATE UNIVERSITY-BULANAO CAMPUS
- PROCUREMENT OF CONSULTANCY SERVICES FOR THE ENVIRONMENTAL IMPACT STATEMENT (EIS) AND ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC) ACQUISITION OF THE KALINGA STATE UNIVERSITY-BULANAO CAMPUS (REPOST)
- PROCUREMENT OF CONSULTANCY SERVICES FOR THE PHILIPPINES QUALITY AWARD PREPARATORY, PRE-PQA ASSESSMENT AND POST LEARNING ACTIVITIES
- Procurement of Consulting Services
- Procurement of CY 2021 Non-Common Use Supplies and Materials
- Procurement of CY 2022 IGI-Funded ICT and Laboratory Equipment
- Procurement of CY 2022 IGI-Funded ICT Equipment
- PROCUREMENT OF CY 2023 IGI-FUNDED ICT EQUIPMENT MODERNIZATION
- PROCUREMENT OF CY 2023 IGI-FUNDED ICT EQUIPMENT MODERNIZATION-SAVINGS
- PROCUREMENT OF ELECTRICAL POWER SYSTEMS LABORATORY TRAINER
- PROCUREMENT OF EQUIPMENT FOR COMPLETED PROJECTS
- PROCUREMENT OF EQUIPMENT FOR COMPLETED PROJECTS – FABRICATION LABORATORY – SECOND BIDDING
- PROCUREMENT OF FIELD AND LABORATORY EQUIPMENT FOR CIVIL ENGINEERING, ELECTRICAL ENGINEERING AND AGRICULTURE AND BIO-SYSTEMS ENGINEERING
- Procurement of Furniture and Fixtures for Computer Laboratories
- Procurement of Furniture and Fixtures for LHS and CHNS
- Procurement of Furnitures and Fixtures, and Laboratory Equipment
- Procurement of Generator for Law Building and Library
- Procurement of GeoStudio System including ICT Equipment
- Procurement of Goods
- PROCUREMENT OF HUMAN RESOURCE INFORMATION AND PAYROLL SYSTEM WITH ITS CORRESPONDING EQUIPMENT
- PROCUREMENT OF HUMAN RESOURCE INFORMATION SYSTEM
- Procurement of ICT and Laboratory Equipment
- Procurement of ICT Equipment with Peripherals, Installation, Configuration and Training
- Procurement of ICT Equipment with Peripherals, Installation, Configuration and Training
- Procurement of ICT Software and Equipment including Field Surveying Equipment
- Procurement of Infrastructure Projects
- Procurement of Internet Subscription for KSU Dagupan and Rizal Campus
- Procurement of IT Equipment, Network Devices and Peripherals, Furniture and Fixtures
- Procurement of Laboratory Apparatuses, Equipment and Chemicals
- Procurement of Meals and Snacks for 2nd Quarter Consolidated Extension Activities
- Procurement of Meals and Snacks for 3rd Quarter Consolidated Extension Activities
- Procurement of Office and Agricultural Supplies and Materials for Heirloom Corn Research Project Year 2
- Procurement of Office Supplies and Materials for Tertiary Education Subsidy
- Procurement of One Unit Book Binding Machine
- Procurement of One Unit Commuter Van
- Procurement of One Unit Commuter Van
- Procurement of Security Services for 11 Months
- Procurement of Security Services for KSU for 12 Months
- Procurement of Service Utility Vehicle
- Procurement of Service Utility Vehicle
- Procurement of Services for KSU College Admission Test
- Procurement of Services for KSU College Admission Test
- PROCUREMENT OF SERVICES FOR SLOPE STABILITY ANALYSIS AND DESIGN OF SUPPORT SYSTEMS AND TRAINING SERVICES FOR THE ROCSCIENCE SOFTWARE
- Procurement of Services of ISO Certifying Body
- Procurement of Services of ISO Certifying Body
- Procurement of Services of ISO Certifying Body
- Procurement of Services of ISO Certifying Body for the Renewal of ISO Certification of Kalinga State University
- Procurement of Supplies, Materials and Equipment for Massive Seeds and Seedling Production
- Procurement of Various CY 2021 IGI-Funded Laboratory Equipment including Furniture and Fixtures
- Procurement of Various CY 2021 IGI-Funded Laboratory Equipment including Furniture and Fixtures
- Procurement of Various ICT Equipment including Furniture and Fixtures for the Kalinga Heritage Studies & Edu-Tourism Center
- Procurement of Various Laboratory Equipment including Furniture and Fixtures
- Procurement of Various Smart Campus ICT Equipment
- Procurement of Various Smart Campus ICT Equipment (2nd Bidding)
- PROCUREMENT OF VARIOUS SMART CAMPUS ICT EQUIPMENT (3RD BIDDING)
- Procurement, Delivery and Installation of Furnitures, Fixtures and Equipment at Alumni Center
- Production Services
- Program Goals and Objectives
- Program Offered
- Program Offered
- Program Offered
- Programs Offered
- Programs Offered
- Programs Offered
- Programs Offered
- Programs Offered
- Programs Offered
- Programs Offered
- Programs Offered
- Programs Offered
- Programs Offered
- Programs Offered
- Provision of Security Service for University 3 Campuses
- Purchase and Delivery of 5 Units Digital Copiers
- Purchase and Delivery of All-in-One Copiers for Library Services
- Purchase and Delivery of Books for College of Law
- Purchase and Delivery of Books for Libraries
- Purchase and Delivery of Books for Library Use
- Purchase and Delivery of Commonly-Used Supplies and Materials
- Purchase and Delivery of Cuttings and Polyethylene Bags for Coffee Seedlings Production under DA-CAR HVCD Program
- Purchase and Delivery of Cuttings and Polyethylene Bags for Coffee Seedlings Production under DA-CAR HVCD Program
- Purchase and Delivery of Drawing Tables for College of Engineering
- Purchase and Delivery of Engineering Laboratory Equipment
- Purchase and Delivery of Equipment for Upgrading of YOOKAH Native Pig Nucleus Farm in CAR Project
- Purchase and Delivery of Equipment for Upgrading of YOOKAH Native Pig Nucleus Farm in CAR Project (2nd Bidding)
- PURCHASE AND DELIVERY OF FULL SET GRADUATION TOGA
- Purchase and Delivery of Furniture, Fixtures and Equipment for ISO Certification
- Purchase and Delivery of Grafted Lanzones and Rambutan for PCAARRD DOST SAFE Project
- PURCHASE AND DELIVERY OF HARDWARE SUPPLIES AND MATERIALS FOR COMMUNITY-BASED COCOON PRODUCTION
- Purchase and Delivery of ICT Equipment
- PURCHASE AND DELIVERY OF ICT EQUIPMENT FOR BAMBOO PROJECT
- PURCHASE AND DELIVERY OF ID CARD PRINTER RIBBON
- Purchase and Delivery of Library Books
- PURCHASE AND DELIVERY OF LIBRARY BOOKS – SECOND BIDDING
- Purchase and Delivery of Machinery Equipment for Printing Services
- Purchase and Delivery of Medicines and Equipment for Dental Services Use
- Purchase and Delivery of Medicines and Supplies for Medical Services Use
- Purchase and Delivery of Muli-cab Vehicle for Business Affairs Services
- Purchase and Delivery of Office Supplies, Materials and Equipment including Janitorial and Consumables for CY 2023
- Purchase and Delivery of Office Supplies, Materials and Equipment including Janitorial and Consumables for CY 2023-Second Bidding
- Purchase and Delivery of One (1) Unit Sports Utility Vehicle for Kalinga State University
- Purchase and Delivery of Optical Mark Reader for Testing Use
- Purchase and Delivery of PE Uniforms and ID Lace for Students’ Use
- PURCHASE AND DELIVERY OF PROFESSIONAL BOOKS
- Purchase and Delivery of Professional Books and Journals for Library Use
- Purchase and Delivery of Professional Books and Journals for Library Use
- Purchase and Delivery of Skills Laboratory Equipment for Biology and Midwifery Programs
- Purchase and Delivery of Supplies and Materials
- PURCHASE AND DELIVERY OF SUPPLIES AND MATERIALS FOR THE HYDROPONICS FACILITY
- PURCHASE AND DELIVERY OF SUPPLIES AND MATERIALS FOR THE HYDROPONICS FACILITY
- PURCHASE AND DELIVERY OF SUPPLIES, MATERIALS AND DEVICES FOR CHNS
- PURCHASE AND DELIVERY OF SUPPLIES, MATERIALS AND EQUIPMENT FOR CAFFEINE PROJECT
- PURCHASE AND DELIVERY OF SUPPLIES, MATERIALS AND EQUIPMENT FOR CAFFEINE PROJECT-SECOND BIDDING
- PURCHASE AND DELIVERY OF SUPPLIES, MATERIALS AND EQUIPMENT NOT AVAILABLE AT PS-DBM FOR CY 2024
- Purchase and Installation of Online Enrolment System with Accounting System
- Purchase and Printing of High School and College PE Uniforms
- Purchase of 2 Units Aircon for Colleges of CLA and CBAPAE Accrditation Rooms
- Purchase of 200 Pieces Monobloc Armchair
- Purchase of 3 Units Vehicle for Kalinga State University
- Purchase of Agricultural Materials for PCAARRD DOST SAFE Project
- PURCHASE OF AGRICULTURAL SUPPLEIS AND MATERIALS FOR THE DIFFERENT COLLEGES
- Purchase of Agricultural Supplies and Equipment for Agbannawag United Farmers Organization
- Purchase of Books
- Purchase of Computer Engineering Laboratory Equipment
- Purchase of Concrete Post for CAF Research on Root Crops Program
- Purchase of Customized T-Shirt for KSU Foundation Day
- Purchase of Dental Supplies and Materials
- Purchase of Dental Supplies and Materials
- Purchase of Equipment and Furnitures for Lying-In/Birthing Home
- Purchase of Equipment for Upgrading of YOOKAH Native Pig Nucleus Farm in CAR
- Purchase of Equipment, Furniture and Fixtures with Complete Peripherals, Installation and Training
- PURCHASE OF FABRICATED EQUIPMENT, LABORATORY SUPPLIES AND MATERIALS FOR KSU ALCOHOL PRODUCTION
- PURCHASE OF FABRICATED EQUIPMENT, LABORATORY SUPPLIES AND MATERIALS FOR KSU ALCOHOL PRODUCTION
- Purchase of Feed Supplies for Egg Production
- Purchase of Firemarms including Accessories and Supplies for the Business Affairs Office
- Purchase of GAA-Funded Common-Use Office and Janitorial Supplies, including Consumables for CY 2021
- Purchase of GAA-Funded Common-Use Office Supplies, Janitorial and Consumables including Miscellaneous Supplies for Cy 2022
- Purchase of Generator Set and Acessories for Rizal Campus
- Purchase of Hand Tractor for Sericulture Use
- Purchase of Hardware Materials for Construction of Two Units Potable Water System at Bulanao Campus
- Purchase of Hardware Materials for Construction of Water Tank Platform for Mulberry Biomass Production
- Purchase of Hardware Materials for PCAARRD-DOST Safe Project
- Purchase of High Capacity and Standards Epson WF-869 Ink Supplies for BAO Auxiliary Use
- Purchase of HITI Card Printer Ribbon CS2 Series for Auxiliary Use
- Purchase of HITI Card Printer Ribbon for BAO-Auxiliary Services
- Purchase of ICT Devices for ICU Use
- Purchase of ICT Equipment and Peripheral for Laboratory Instructional Purposes
- Purchase of ICT Equipment with Peripherals, Installation, Configuration and Training including Furniture’s for Research and Extension Building
- PURCHASE OF IGF-FUNDED COMMON-USE OFFICE SUPPLIES, JANITORIAL AND CONSUMABLES FOR CY 2022
- Purchase of IGI-Funded Non-Common Use Office and Janitorial Supplies, including Consumables for CY 2021
- Purchase of IT Equipment and Furniture for eLibrary Modernization
- Purchase of IT Equipment and Furniture for eLibrary Modernization (2nd Posting and Bidding)
- Purchase of Knapsack Sprayer for PCAARRD DOST SAFE Project
- Purchase of Laboratory Apparatuses, Equipment and Supplies
- Purchase of Laptop and Projector for Various Offices Use
- Purchase of Laptop and Projector for Various Offices Use
- PURCHASE OF LAYER COOP FOR BAO-LAYER CAGES PROJECT
- Purchase of Library Books
- Purchase of Library Books
- Purchase of Medical Supplies and Materials
- Purchase of Medical Supplies and Materials
- Purchase of Medical Supplies and Materials for Health Services
- Purchase of Medicines for Dental Services
- Purchase of Medicines, Supplies and Equipment for Dental Services
- Purchase of Medicines, Supplies and Equipment for Dental Services
- Purchase of Medicines, Supplies and Equipment for Health Services
- Purchase of Medicines, Supplies and Materials for Bulanao Campus for 2024
- Purchase of Medicines, Supplies and Materials for First Quarter of CY 2021
- Purchase of Miscellaneous Supplies for Business Affairs Office Cafetaria
- Purchase of Muli-cab Vehicle for Business Affairs Services
- Purchase of Multifunction Copier and ICT Equipment including Peripherals
- Purchase of NSTP Uniform for New and Transferee Students
- Purchase of Office and Agricultural Supplies and Materials for Heirloom Corn Research Project
- Purchase of Office and Janitorial Supplies and Materials
- Purchase of Office equipment for BAO-Auxiliary Production Purposes
- Purchase of Office equipment for BAO-Auxiliary Production Purposes
- Purchase of Office Supplies and Equipment for Research and Extension Use
- Purchase of Office Supplies for Accreditation Use
- Purchase of Office Supplies for CBEA Accreditation Use
- Purchase of Office Supplies, Materials and Consumables for FY 2020
- Purchase of Office Supplies, Materials and Consumables for Use of Different Offices
- PURCHASE OF ONE (1) UNIT COASTER VEHICLE (MINI-BUS) FOR KALINGA STATE UNIVERSITY
- Purchase of One (1) Unit Coaster Vehicle (Mini-Bus) for Kalinga State University-Second Bidding
- Purchase of One Unit Collator for BAO-Auxiliary Services
- Purchase of Painting Materials for Repainting of Covered Pathwalks
- Purchase of Paper Supplies for BAO Auxiliary Services Use
- Purchase of PE Uniform for Incoming Junior and Senior High Schools and New Students
- Purchase of Printing Equipment and Accessories for BAO Auxiliary
- Purchase of Pruning Shear for PCAARRD DOST SAFE Project
- PURCHASE OF SCHOOL SUPPLIES AND MATERIALS FOR INCOME GENERATING PROJECT
- PURCHASE OF SKILLS LABORATORY EQUIPMENT FOR CHNS RLE
- Purchase of Sports and Other Materials for Use of Sports and Socio-Cultural Affairs
- Purchase of Sports Materials and Equipment for Fitness Program
- Purchase of Supplies and Equipment for TESDA Training and Assessment Center
- Purchase of Supplies and Materials for LHS Face Mask Production
- Purchase of Supplies and Materials for NFT Circulating, Hydroponics System
- Purchase of Supplies and Materials for PCAARRD-DOST SAFE Project
- Purchase of Supplies and Materials for Research and Development Native Pig Project
- Purchase of Test Materials for Research and Development Use to correlates Emotional-Social Intelligence
- Purchase of Various Books as Compliance to KSU Universitihood (First Bidding)
- Purchase of Various Books as Compliance to KSU Universitihood (Second Bidding)
- Purchase of Various Equipment Outlay
- Purchase of Various Laboratory Equipment
- Purchase Order No: 2020-10-0363
- Purchase Order No: 2020-10-0364
- Purchase Order No: 2020-11-0475
- Purchase Order No: 2020-11-0476
- Purchase Order No: 2020-12-0500
- Purchase Order No: 2020-12-0512
- Purchase Order No: 2023-05-0396
- Purchase Order No.: 2020-12-0510
- Purchase Order No.: 2020-12-0510
- Purchase Order to Bongdoen_
- Purchase Order to Don Jackson_
- Purchase Order to Malabong_
- Purchase Order with Conforme_
- Purchase Order_
- Purchase Order_0
- Purchase Order_0-1
- Purchase Order_0-1
- Purchase Order_001
- Purchase Order_001
- Purchase Order_001
- Purchase Order_001
- Purchase Order_001
- Purchase Order_001
- Purchase Order_001_0046
- Purchase Order_001_1
- Purchase Order_001_1
- Purchase Order_001_2
- Purchase Order_001_3
- Purchase Order_1
- Purchase Order_1
- Purchase Order_1_1
- Purchase Order_1_4
- Purchase Order_10
- Purchase Order_10
- Purchase Order_11
- Purchase Order_11
- Purchase Order_12
- Purchase Order_12
- Purchase Order_13
- Purchase Order_13
- Purchase Order_15
- Purchase Order_15
- Purchase Order_16
- Purchase Order_17
- Purchase Order_18
- Purchase Order_19
- Purchase Order_2
- Purchase Order_2
- Purchase Order_2_2
- Purchase Order_2-1
- Purchase Order_20
- Purchase Order_2020-07-0197
- Purchase Order_2020-09-0302
- Purchase Order_2020-10-0389
- Purchase Order_2020-11-0463
- Purchase Order_24
- Purchase Order_25
- Purchase Order_26
- Purchase Order_27
- Purchase Order_28
- Purchase Order_29
- Purchase Order_3
- Purchase Order_3_1
- Purchase Order_30
- Purchase Order_31
- Purchase Order_32
- Purchase Order_33
- Purchase Order_34
- Purchase Order_35
- Purchase Order_37
- Purchase Order_38
- Purchase Order_39
- Purchase Order_4
- Purchase Order_40
- Purchase Order_41
- Purchase Order_42
- Purchase Order_43
- Purchase Order_44
- Purchase Order_45
- Purchase Order_46
- Purchase Order_48
- Purchase Order_49
- Purchase Order_5
- Purchase Order_54-1
- Purchase Order_6
- Purchase Order_61
- Purchase Order_62
- Purchase Order_63
- Purchase Order_64
- Purchase Order_65
- Purchase Order_7
- Purchase Order_7
- Purchase Order_8
- Purchase Order_8_1
- Purchase Order_9
- Purchase Order_9
- Purchase Order_Atipse
- Purchase Order_Atipse1
- Purchase Order_Gakken
- Purchase Order_Gakken_1
- Purchase Order_Ibanez
- Purchase Order_JM Ibanez_1
- Purchase Order_Kimmongo Gen_
- Purchase Order_LightHouse_
- Purchase Order_Lorenzo Electronics_
- Purchase Order_NOA_
- Purchase Order_NTP_
- Purchase Order_PhilDuplicators_
- Purchase Order_PhilDuplicators_1
- Purchase Order_PhilTSEAT Sin-Co_
- Purchase Order_Raygin Lights_
- Purchase Order_Tugue Bombay Bazar
- Purchase Order_Unconfirmed_0
- Purchase Order_Unconfirmed_0054
- Purchase Order_Unconfirmed_1
- Purchase Order_Unconfirmed_2
- Purchase Order: 0005_14
- Purchase Order: 0005_47
- Purchase Order: 0034
- Purchase Request as IB_
- Purchase Request as RFQ_
- Purchase Request_
- Purchase Request_0
- Purchase Request_0001
- Purchase Request_1
- Purchase Request_12
- Purchase Request_13
- Purchase Request_14
- Purchase Request_15
- Purchase Request_16
- Purchase Request_17
- Purchase Request_17
- Purchase Request_18
- Purchase Request_19
- Purchase Request_2
- Purchase Request_20
- Purchase Request_21
- Purchase Request_22
- Purchase Request_23
- Purchase Request_27
- Purchase Request_28
- Purchase Request_29
- Purchase Request_3
- Purchase Request_30
- Purchase Request_31
- Purchase Request_32
- Purchase Request_33
- Purchase Request_34
- Purchase Request_35
- Purchase Request_36
- Purchase Request_37
- Purchase Request_38
- Purchase Request_39
- Purchase Request_4
- Purchase Request_40
- Purchase Request_41
- Purchase Request_42
- Purchase Request_43
- Purchase Request_44
- Purchase Request_45
- Purchase Request_46
- Purchase Request_47
- Purchase Request_48
- Purchase Request_49
- Purchase Request_5
- Purchase Request_50
- Purchase Request_51
- Purchase Request_52
- Purchase Request_53
- Purchase Request_54
- Purchase Request_55
- Purchase Request_56
- Purchase Request_57
- Purchase Request_58
- Purchase Request_59
- Purchase Request_6
- Purchase Request_60
- Purchase Request_61
- Purchase Request_62
- Purchase Request_63
- Purchase Request_64
- Purchase Request_65
- Purchase Request_66
- Purchase Request_67
- Purchase Request_68
- Purchase Request_69
- Purchase Request_7
- Purchase Request_8
- Purchase Request_8_1
- Purchase Request_9
- Purchase, Delivery and Installation of Furnitures and Fixtures for CCJE Office
- PURCHASE, DELIVERY AND INSTALLATION OF GENERATOR SET FOR KALINGA STATE UNIVERSITY ADMINISTRATION BUILDING – BULANAO CAMPUS
- Quality Assurance
- RA10584
- RDET
- RDET
- Refill of Fire Extinguisher for general services use
- Rehabilitation of Cold-Water Lines and Sewer Lines of Law Building
- Rehabilitation of the College of Education Building’s Electrical Wirings
- Renovation of Accounting Office
- Renovation of Alumni Building
- RENOVATION OF CEILING AND WALL PARTITIONS AT THE GROUND FLOOR OF THE HIGH SCHOOL BUILDING
- Renovation of Registrar’s Office
- Renovation or Construction of Comfort Room with Sewage Outlet of KSU Dagupan Campus
- REPAINTING OF COLLEGE OF AGRICULTURE AND COLLEGE OF FORESTRY BUILDINGS
- Repainting of Dagupan Campus Covered Pathwalk and Façade of CLA Building including Fixing Damaged Pipes
- Repainting of Engineering Building and Upgrading of Elevator System
- Repainting of Engineering Building and Upgrading of Elevator System-Second Bidding
- REPAIR AND CONVERSION OF PRESIDENTS COTTAGE TO GENDER AND DEVELOPMENT OFFICE
- REPAIR AND CONVERSION OF PRESIDENTS COTTAGE TO GENDER AND DEVELOPMENT OFFICE
- Repair and Improvement of Structures/ Facilities and Acquisition of Equipment
- Repair and Improvement of Structures/Facilities
- Repair and Improvement of Structures/Facilities
- Repair and Improvement of Structures/Facilities
- Repair and Maintenance of Kinglong Bus
- Repair and Maintenance of Research, Agriculture and Forestry Laboratory Building’s Ceiling and Flooring
- Repair and Maintenance of ROTC Building
- Repair and Maintenance of SHZ 702 Vehicle
- Repair and Maintenance of SHZ 702 Vehicle
- Repair and Maintenance of SHZ 702 Vehicle
- Repair and Maintenance of SJV 703 Vehicle
- Repair of Dagupan Library
- Repair of Elevator at CEIT Building
- Repair of Engine, Under-Chassis and Electrical Parts of Vehicle SHZ 702
- REPAIR OF FIRE EXIT LADDER AT CLASS AND CBAA
- REPAIR OF FIRE EXIT LADDER AT CLASS AND CBAA
- REPAIR OF FLOOR TILES, DOORS, CANOPY & PLUMBING WORKS AT LAW BUILDING
- REPAIR OF HIGH SCHOOL BUILDING (ROOFING, CEILING AND DOWNSPOUT)
- Repair of HRM Building
- REPAIR OF LADIES DORMITORY OF BULANAO CAMPUS
- Repair of Polycarbonate Shed with Hand Railings at Rizal Campus
- Repair of Poultry
- Repair of Poultry Floor Framing and Deepwell
- Repairs and Renovation of Forestry Building
- Repairs and Renovation of Forestry Building
- Report Card (PBB)
- Reprinting of Landslide Extension Program Guidebook
- Request for Expression of Interest_
- Request for Negotiated Procurement_
- Request for Negotiated Procurement_0
- Request for Negotiated Procurement_1
- Request for Proposal_0
- Request for Proposal_066
- Request for Proposal_1
- Request for Proposal_2
- Request for Proposal_2_3
- Request for Proposal_3
- Request for Proposal_4
- Request for Proposal_5
- Request for Proposal_6
- Request for Proposal_ROCSCIENCE
- Request for Quatation_136
- Request for Quotation
- Request for Quotation_
- Request for Quotation_
- Request for Quotation_
- Request for Quotation_0
- Request for Quotation_0
- Request for Quotation_003
- Request for Quotation_1
- Request for Quotation_1
- Request for Quotation_10
- Request for Quotation_100
- Request for Quotation_101
- Request for Quotation_102
- Request for Quotation_103
- Request for Quotation_105
- Request for Quotation_106
- Request for Quotation_107
- Request for Quotation_108
- Request for Quotation_109
- Request for Quotation_11
- Request for Quotation_110
- Request for Quotation_111
- Request for Quotation_112
- Request for Quotation_113
- Request for Quotation_114
- Request for Quotation_115
- Request for Quotation_116
- Request for Quotation_117
- Request for Quotation_119
- Request for Quotation_12
- Request for Quotation_120
- Request for Quotation_121
- Request for Quotation_122
- Request for Quotation_123
- Request for Quotation_124
- Request for Quotation_126
- Request for Quotation_127
- Request for Quotation_128
- Request for Quotation_129
- Request for Quotation_13
- Request for Quotation_130
- Request for Quotation_131
- Request for Quotation_133
- Request for Quotation_134
- Request for Quotation_135
- Request for Quotation_137
- Request for Quotation_139
- Request for Quotation_14
- Request for Quotation_140
- Request for Quotation_15
- Request for Quotation_16
- Request for Quotation_18
- Request for Quotation_19
- Request for Quotation_2
- Request for Quotation_2
- Request for Quotation_20
- Request for Quotation_21
- Request for Quotation_22
- Request for Quotation_23
- Request for Quotation_24
- Request for Quotation_25
- Request for Quotation_26
- Request for Quotation_27
- Request for Quotation_28
- Request for Quotation_29
- Request for Quotation_3
- Request for Quotation_30
- Request for Quotation_31
- Request for Quotation_32
- Request for Quotation_33
- Request for Quotation_34
- Request for Quotation_35
- Request for Quotation_36
- Request for Quotation_37
- Request for Quotation_38
- Request for Quotation_39
- Request for Quotation_4
- Request for Quotation_40
- Request for Quotation_41
- Request for Quotation_42
- Request for Quotation_43
- Request for Quotation_44
- Request for Quotation_45
- Request for Quotation_46
- Request for Quotation_47
- Request for Quotation_48
- Request for Quotation_49
- Request for Quotation_50
- Request for Quotation_51
- Request for Quotation_52
- Request for Quotation_53
- Request for Quotation_54
- Request for Quotation_55
- Request for Quotation_56
- Request for Quotation_57
- Request for Quotation_58
- Request for Quotation_59
- Request for Quotation_6
- Request for Quotation_60
- Request for Quotation_68
- Request for Quotation_68
- Request for Quotation_69
- Request for Quotation_7
- Request for Quotation_70
- Request for Quotation_71
- Request for Quotation_72
- Request for Quotation_73
- Request for Quotation_74
- Request for Quotation_75
- Request for Quotation_76
- Request for Quotation_77
- Request for Quotation_78
- Request for Quotation_79
- Request for Quotation_8
- Request for Quotation_80
- Request for Quotation_81
- Request for Quotation_82
- Request for Quotation_83
- Request for Quotation_84
- Request for Quotation_85
- Request for Quotation_86
- Request for Quotation_87
- Request for Quotation_88
- Request for Quotation_89
- Request for Quotation_9
- Request for Quotation_90
- Request for Quotation_91
- Request for Quotation_92
- Request for Quotation_93
- Request for Quotation_94
- Request for Quotation_95
- Request for Quotation_96
- Request for Quotation_97
- Request for Quotation_98
- Request for Quotation_99
- Request for Quotation_Signed
- Request for Quotation-1_0
- Request for Quotations_104
- RESTORATION AND REINFORCING OF GEO-GRID ON THE DAMAGED RICE TERRACES
- Restoration and Reinforcing of Geo-Grid on the Damaged Rice Terraces-Second bidding
- Result of the First Special Board Meeting of the Kalinga State University Board of Regents
- Rice and Corn Bran for Native Pig Production
- Rice and Corn Bran for Native Pig Production
- ROOF REPLACEMENT AND ADDITIONAL MATERIALS OF KSU POULTRY- BULANAO CAMPUS
- SBB No. 01
- SBB No. 01
- SBB No. 01
- SBB No. 01_
- SBB No. 01_
- SBB No. 01_
- SBB No. 01_0
- SBB No. 01_0
- SBB No. 01_01
- SBB No. 01_01
- SBB No. 01_1
- SBB No. 01_1
- SBB No. 01_1
- SBB No. 01_1
- SBB No. 01_1
- SBB No. 01_1
- SBB No. 01_10
- SBB No. 01_10
- SBB No. 01_11
- SBB No. 01_11
- SBB No. 01_13
- SBB No. 01_14
- SBB No. 01_15
- SBB No. 01_16
- SBB No. 01_18
- SBB No. 01_19
- SBB No. 01_2
- SBB No. 01_2
- SBB No. 01_20
- SBB No. 01_21
- SBB No. 01_23
- SBB No. 01_25
- SBB No. 01_26
- SBB No. 01_27
- SBB No. 01_28
- SBB No. 01_29
- SBB No. 01_3
- SBB No. 01_3
- SBB No. 01_31
- SBB No. 01_31
- SBB No. 01_32
- SBB No. 01_33
- SBB No. 01_34
- SBB No. 01_35
- SBB No. 01_36
- SBB No. 01_37
- SBB No. 01_38
- SBB No. 01_39
- SBB No. 01_4
- SBB No. 01_4
- SBB No. 01_41
- SBB No. 01_42
- SBB No. 01_43
- SBB No. 01_44
- SBB No. 01_45
- SBB No. 01_46
- SBB No. 01_47
- SBB No. 01_48
- SBB No. 01_49
- SBB No. 01_5
- SBB No. 01_50
- SBB No. 01_51
- SBB No. 01_52
- SBB No. 01_53
- SBB No. 01_54
- SBB No. 01_55
- SBB No. 01_56
- SBB No. 01_57
- SBB No. 01_58
- SBB No. 01_59
- SBB No. 01_6
- SBB No. 01_6
- SBB No. 01_60
- SBB No. 01_61
- SBB No. 01_63
- SBB No. 01_64
- SBB No. 01_65
- SBB No. 01_66
- SBB No. 01_67
- SBB No. 01_68
- SBB No. 01_69
- SBB No. 01_7
- SBB No. 01_7
- SBB No. 01_70
- SBB No. 01_71
- SBB No. 01_72
- SBB No. 01_73
- SBB No. 01_74
- SBB No. 01_75
- SBB No. 01_76
- SBB No. 01_77
- SBB No. 01_78
- SBB No. 01_8
- SBB No. 01_8
- SBB No. 01_9
- SBB No. 01_9
- SBB No. 01_Merge
- SBB No. 01_Signed
- SBB No. 01_signed
- SBB No. 01-17
- SBB No. 02_0_1
- SBB No. 02_1
- SBB No. 02_2
- SBB No. 02_3_1
- SBB No. O1_(1)
- SBB Posting at Conspicuous_Places_
- SBB Unnumbered
- SBB_BID Supplemental Abstract_
- SBB_BID_SupplementView_
- SBB_PHILGEPS_Bid Supplement_
- Schedule of Prices_7
- Schedule of Prices_Lot 1
- Scholarships
- SDG
- SDG 10: REDUCED INEQUALITIES
- SDG 11: SUSTAINABLE CITIES AND COMMUNITIES
- SDG 12: RESPONSIBLE CONSUMPTION AND PRODUCTION
- SDG 13: CLIMATE ACTION
- SDG 14: LIFE BELOW WATER
- SDG 15: LIFE ON LAND
- SDG 16: PEACE, JUSTICE AND STRONG INSTITUTIONS
- SDG 17: PARTNERSHIPS FOR THE GOALS
- SDG 2: ZERO HUNGER
- SDG 3: GOOD HEALTH AND WELL-BEING
- SDG 4 – QUALITY EDUCATION
- SDG 5: GENDER EQUALITY
- SDG 6: CLEAN WATER AND SANITATION
- SDG 7: AFFORDABLE AND CLEAN ENERGY
- SDG 8: DECENT WORK AND ECONOMIC GROWTH
- SDG 9: INDUSTRY, INNOVATION AND INFRASTRUCTURE
- SDG: Uncategorized
- Signed PO_
- Signed PO_1
- Site Map
- Snacks and Meals for 2020 Virtual Annual Agency in House Review
- Snacks and Meals for 2nd Annual Agency In-house Review
- Snacks and Meals for Annual Agency In-house Review
- Snacks and Meals for COED Extension Seminar on DRRM and GAD
- Snacks and Meals for Dance Fundamentals for Non-Physical Education Majors
- Snacks and Meals for Documentation of Ethnomedicinal Plans from Lower Kalinga
- Snacks and Meals for Homecoming and Induction Program of KSU Alumni Federation
- Snacks and Meals for Level 2 Procurement Specialist Training
- Snacks and Meals for the Mentoring of Neophyte Researchers thru Presentation of Proposals
- Snacks and Meals for Training Activities of PCAARRD DOST SAFE Project
- Snacks, Meals and Hall Rental for How to Win a Job Seminar
- Solar Powered Irrigation System for Improved Mulberry Biomass Production
- Solar Powered Irrigation System for Improved Mulberry Biomass Production
- Solar Powered Irrigation System for Improved Mulberry Biomass Production
- Sound System and Accessories for SSC Bulanao Campus
- Strategic Performance Management System
- Structural Engineering Services (Steel Design) for Four-Storey Library Building- Bulanao Campus
- Student Services
- Summary Report on Disbursements 2024 Third Quarter
- Supplemental Bid Bulletin_1
- Supplemental Bid_01
- Supplemental Bid_01
- Supplemental Bid_Bulletin
- Supplemental Bid_SBB_01
- Supplemental Bids No. 1-3
- Supplemental Bids_1-2
- Supplemental Bulletin No. 01
- Supplies and Materials for DOST SAFE Project
- Supplies and Materials for ICU
- Supplies and Materials for TES Team
- Supplies for Alcohol Making by Central Science Laboratory
- Supplies for SY 2020-2021 College Graduation
- Supplies, Materials, Foods and Other Training Needs for DOST SAFE Project
- Supply and Delivery of Common-Use Supplies and Equipment
- Supply and Delivery of Laboratory Apparatus, Materials, Fixtures and Chemicals
- Supply and Delivery of Ready to Lay Pullets for Layer Production
- Supply and Delivery of Ready-to-Lay Pullet for Layer Production
- Supply, Delivery and Installation of Protective Covering for Basketball Court
- System of Ranking Delivery Units for FY 2019 PBB
- System of Ranking Delivery Units for FY 2020 PBB
- Terms of Reference Security_services
- Terms of Reference_
- Toga Rental for Graduation Use
- TOR for ROCSCIENCE
- Transparency Seal
- University Code
- University History
- University Hymn
- University Memo in Cascading of the PBB 2023 Guidelines
- University Officials
- University President
- University Quality Manual
- Updated Guidelines in the Review and Compliance Procedure of Statements and Financial Disclosures
- Updated People’s FOI Manual
- Upgrading of 3-Phase Line Distribution Power System of KSU Bulanao Campus- Phase I
- Upgrading of 3-Phase Line Distribution Power System of KSU Bulanao Campus- Phase I
- Upgrading of 3-Phase Line Distribution Power System of KSU Bulanao Campus- Phase I
- Upgrading of Button Mushroom Facility at Kalinga State University
- Upgrading of Electrical Lines to 3-Phase of KSU Rizal Campus
- Upgrading of Food Processing & Research Center
- Upgrading of Laboratory Facilities of the College of Agriculture
- UPGRADING OF LABORATORY FACILITIES OF THE COLLEGE OF AGRICULTURE-ICT EQUIPMENT-SECOND BIDDING
- UPGRADING OF RADIO AND SERVER ROOM OF RIZAL CAMPUS, ICT COMPUTER AND SPEECH LABORATORY OF ALL CAMPUSES
- URSP Letter of Confirmation re: Conduct of Surveillance 1 Audit
- Vision, Mission, Goals & Objectives
- Vision, Mission, Goals & Objectives
- Vision, Mission, Goals and Objectives
- Vision, Mission, Goals and Objectives
- Vision, Mission, Goals and Objectives
- Vision, Mission, Goals and Objectives
- Vision, Mission, Goals and Objectives
- Vision, Mission, Goals and Objectives
- Vision, Mission, Goals and Objectives
- Vision, Mission, Goals and Objectives
- Vision, Mission, Goals and Objectives
- Vision, Mission, Goals and Objectives
- Vision, Mission, Goals and Objectives
- VP for Academic Affairs & Student Dev’t.
- VP for Admin & Finance
- VP for Research Dev’t. Extension & Training
- Water Supply for Men’s Dorm and Accountant’s Cottage
- Wooden Frame with Glass for Citizen’s Charter Framing
- Writing Pads for Office of the President
- List of Vacant Positions (Jan. 2019)
- SDG 1: NO POVERTY